example_id
string
benchmark_split
string
difficulty
string
product_scope
string
task_family
string
dataset_license
string
annotation_status
string
confidence
float64
creative_brief
dict
brand_context
dict
audience_profile
dict
available_assets
list
constraints
list
reference_output
dict
review_path
list
risk_register
list
rubric
dict
project_frame
dict
message_hierarchy
list
audience_segments
list
channel_strategy
list
approval_matrix
list
reference_brief_package
dict
success_checks
list
evidence_manifest
dict
reference_variants
list
negative_examples
list
difficulty_rationale
string
benchmark_slices
list
adversarial_features
list
expected_failure_modes
list
review_readiness
dict
zarn_creative_brief_to_asset_plan_train_0200
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Juniper Relay", "theme": "new feature push", "project_background": "Juniper Relay needs support for new feature push and wants work that feels expert and calm without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "lean internal teams", "channels": [ "...
{ "vertical": "software", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proo...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0201
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Signal Oak", "theme": "creator partnership", "project_background": "Signal Oak needs support for creator partnership and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "marketing leads", "channels": [ ...
{ "vertical": "beauty", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into som...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset."...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0202
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Velora Motion", "theme": "seasonal launch", "project_background": "Velora Motion needs support for seasonal launch and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "improve review speed", "audience": "lean internal teams", "channels": [ "In...
{ "vertical": "fintech", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0203
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "First Mile Creative", "theme": "creator partnership", "project_background": "First Mile Creative needs support for creator partnership and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "creator operators", ...
{ "vertical": "fintech", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Email", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim into somet...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Email", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0204
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Juniper Relay", "theme": "ugc collection", "project_background": "Juniper Relay needs support for ugc collection and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "lean internal teams", "channels": ...
{ "vertical": "fintech", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "LinkedIn", "reason": "Turns the claim into...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "LinkedIn", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ass...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0205
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Glowforge Labs", "theme": "ugc collection", "project_background": "Glowforge Labs needs support for ugc collection and wants work that feels expert and calm without losing practical clarity.", "business_goal": "improve review speed", "audience": "busy founders", "channels": [ "App onboarding...
{ "vertical": "beauty", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into som...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line acro...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset."...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0206
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Harborline Works", "theme": "new feature push", "project_background": "Harborline Works needs support for new feature push and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "busy founders", "channels": [...
{ "vertical": "travel", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Landing page", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "TikTok", "reason": "Turns the claim into some...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "Landing page", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "TikTok", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0207
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Juniper Relay", "theme": "new feature push", "project_background": "Juniper Relay needs support for new feature push and wants work that feels clear and practical without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "marketing leads", "channels": [ "...
{ "vertical": "beauty", "tone": "clear and practical", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into som...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proo...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset."...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0208
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Juniper Relay", "theme": "event promo", "project_background": "Juniper Relay needs support for event promo and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "marketing leads", "channels": [ "YouTube ...
{ "vertical": "productivity", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "LinkedIn", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "LinkedIn", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0209
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Juniper Relay", "theme": "ugc collection", "project_background": "Juniper Relay needs support for ugc collection and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "improve review speed", "audience": "busy founders", "channels": [ "YouTube S...
{ "vertical": "productivity", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into som...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset."...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0210
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "First Mile Creative", "theme": "ugc collection", "project_background": "First Mile Creative needs support for ugc collection and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "busy founders", "channe...
{ "vertical": "consumer hardware", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim i...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0211
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Orbit Thread", "theme": "seasonal launch", "project_background": "Orbit Thread needs support for seasonal launch and wants work that feels expert and calm without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "creator operators", "channels": [ "TikTok"...
{ "vertical": "wellness", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "TikTok", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim into some...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "TikTok", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0212
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Velora Motion", "theme": "seasonal launch", "project_background": "Velora Motion needs support for seasonal launch and wants work that feels expert and calm without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "creator operators", "channels": [ "App o...
{ "vertical": "consumer hardware", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Webinar follow-up", "reason": "Turns the cl...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Webinar follow-up", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0213
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Velora Motion", "theme": "new feature push", "project_background": "Velora Motion needs support for new feature push and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "creator operators", "channels": [ ...
{ "vertical": "health tech", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Landing page", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the claim i...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Landing page", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0214
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Northbeam Studio", "theme": "new feature push", "project_background": "Northbeam Studio needs support for new feature push and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "lean internal teams", "chann...
{ "vertical": "consumer hardware", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into som...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset."...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0215
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Glowforge Labs", "theme": "new feature push", "project_background": "Glowforge Labs needs support for new feature push and wants work that feels expert and calm without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "creator operators", "channels": [ "A...
{ "vertical": "software", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "TikTok", "reason": "Turns the claim into so...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "TikTok", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset....
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0216
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "First Mile Creative", "theme": "creator partnership", "project_background": "First Mile Creative needs support for creator partnership and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "marketing leads", ...
{ "vertical": "software", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proo...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0217
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Echoframe Media", "theme": "ugc collection", "project_background": "Echoframe Media needs support for ugc collection and wants work that feels fast and witty without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "brand managers", "channels": [ "Linked...
{ "vertical": "media tools", "tone": "fast and witty", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "App onboarding", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "App onboarding", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0218
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Signal Oak", "theme": "seasonal launch", "project_background": "Signal Oak needs support for seasonal launch and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "marketing leads", "channels": [ "Instagr...
{ "vertical": "beauty", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into so...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset....
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0219
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Glowforge Labs", "theme": "seasonal launch", "project_background": "Glowforge Labs needs support for seasonal launch and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "brand managers", "channels": [...
{ "vertical": "beauty", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "TikTok", "reason": "Turns the claim into...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "TikTok", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ass...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0220
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Glowforge Labs", "theme": "creator partnership", "project_background": "Glowforge Labs needs support for creator partnership and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "busy founders", "channels": ...
{ "vertical": "creator education", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Email", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the claim into som...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "Email", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset."...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0221
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "First Mile Creative", "theme": "seasonal launch", "project_background": "First Mile Creative needs support for seasonal launch and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "brand managers", "ch...
{ "vertical": "wellness", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "LinkedIn", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "LinkedIn", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0222
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Lattice Harbor", "theme": "event promo", "project_background": "Lattice Harbor needs support for event promo and wants work that feels expert and calm without losing practical clarity.", "business_goal": "improve review speed", "audience": "marketing leads", "channels": [ "Webinar follow-up"...
{ "vertical": "consumer hardware", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across the a...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0223
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Velora Motion", "theme": "event promo", "project_background": "Velora Motion needs support for event promo and wants work that feels clear and practical without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "brand managers", "channels": [ "Instagram R...
{ "vertical": "creator education", "tone": "clear and practical", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0224
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Northbeam Studio", "theme": "creator partnership", "project_background": "Northbeam Studio needs support for creator partnership and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "lean internal teams", "...
{ "vertical": "beauty", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "TikTok", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the claim into s...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "TikTok", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0225
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Cinder Atlas", "theme": "new feature push", "project_background": "Cinder Atlas needs support for new feature push and wants work that feels clear and practical without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "busy founders", "channels": [ "App o...
{ "vertical": "health tech", "tone": "clear and practical", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the claim...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating th...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0226
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Orbit Thread", "theme": "creator partnership", "project_background": "Orbit Thread needs support for creator partnership and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "creator operators", "channels":...
{ "vertical": "creator education", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the cl...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0227
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Northbeam Studio", "theme": "new feature push", "project_background": "Northbeam Studio needs support for new feature push and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "marketing leads", "channels"...
{ "vertical": "productivity", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into so...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset....
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0228
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Signal Oak", "theme": "event promo", "project_background": "Signal Oak needs support for event promo and wants work that feels clear and practical without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "busy founders", "channels": [ "Instagram Reels", ...
{ "vertical": "media tools", "tone": "clear and practical", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proo...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0229
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Harborline Works", "theme": "creator partnership", "project_background": "Harborline Works needs support for creator partnership and wants work that feels fast and witty without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "creator operators", "channels":...
{ "vertical": "beauty", "tone": "fast and witty", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "LinkedIn", "reason": "Turns the claim in...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "LinkedIn", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the a...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0230
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Echoframe Media", "theme": "new feature push", "project_background": "Echoframe Media needs support for new feature push and wants work that feels expert and calm without losing practical clarity.", "business_goal": "improve review speed", "audience": "brand managers", "channels": [ "LinkedI...
{ "vertical": "software", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Webinar follow-up", "reason": "Turns the claim in...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Webinar follow-up", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the a...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0231
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "First Mile Creative", "theme": "new feature push", "project_background": "First Mile Creative needs support for new feature push and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "improve review speed", "audience": "creator operators", "channels...
{ "vertical": "software", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "LinkedIn", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across the a...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "LinkedIn", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0232
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Signal Oak", "theme": "new feature push", "project_background": "Signal Oak needs support for new feature push and wants work that feels expert and calm without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "lean internal teams", "channels": [ "Email",...
{ "vertical": "beauty", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Email", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the claim into som...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "Email", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset."...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0233
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Harborline Works", "theme": "creator partnership", "project_background": "Harborline Works needs support for creator partnership and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "marketing leads", ...
{ "vertical": "travel", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Email", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim into somet...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "Email", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0234
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Orbit Thread", "theme": "seasonal launch", "project_background": "Orbit Thread needs support for seasonal launch and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "improve review speed", "audience": "creator operators", "channels": [ "YouTub...
{ "vertical": "travel", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "App onboarding", "reason": "Turns the claim...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "App onboarding", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating th...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0235
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Glowforge Labs", "theme": "ugc collection", "project_background": "Glowforge Labs needs support for ugc collection and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "creator operators", "channels": [ ...
{ "vertical": "media tools", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Email", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Webinar follow-up", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Email", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Webinar follow-up", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0236
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Juniper Relay", "theme": "event promo", "project_background": "Juniper Relay needs support for event promo and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "improve review speed", "audience": "creator operators", "channels": [ "YouTube Shor...
{ "vertical": "creator education", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0237
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Velora Motion", "theme": "event promo", "project_background": "Velora Motion needs support for event promo and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "improve review speed", "audience": "brand managers", "channels": [ "Landing page",...
{ "vertical": "productivity", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Landing page", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "App onboarding", "reason": "Turns the claim i...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line acro...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "Landing page", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "App onboarding", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0238
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Velora Motion", "theme": "creator partnership", "project_background": "Velora Motion needs support for creator partnership and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "creator operators", "channels...
{ "vertical": "creator education", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0239
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Orbit Thread", "theme": "seasonal launch", "project_background": "Orbit Thread needs support for seasonal launch and wants work that feels fast and witty without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "busy founders", "channels": [ "LinkedIn", ...
{ "vertical": "fintech", "tone": "fast and witty", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the claim into...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proo...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ass...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0240
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Cinder Atlas", "theme": "event promo", "project_background": "Cinder Atlas needs support for event promo and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "busy founders", "channels": [ "TikTok", ...
{ "vertical": "consumer hardware", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "TikTok", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the claim into s...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proo...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "TikTok", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0241
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Cinder Atlas", "theme": "new feature push", "project_background": "Cinder Atlas needs support for new feature push and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "lean internal teams", "channels"...
{ "vertical": "wellness", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into som...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset."...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0242
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Orbit Thread", "theme": "ugc collection", "project_background": "Orbit Thread needs support for ugc collection and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "brand managers", "channels": [ "Instag...
{ "vertical": "travel", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "App onboarding", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "App onboarding", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0243
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Tidal North Labs", "theme": "event promo", "project_background": "Tidal North Labs needs support for event promo and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "brand managers", "channels": [ "App ...
{ "vertical": "travel", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the claim...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating th...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0244
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Tidal North Labs", "theme": "ugc collection", "project_background": "Tidal North Labs needs support for ugc collection and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "lean internal teams", "channels": ...
{ "vertical": "creator education", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "TikTok", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Webinar follow-up", "reason": "Turns the claim into...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "TikTok", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Webinar follow-up", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ass...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0245
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Juniper Relay", "theme": "seasonal launch", "project_background": "Juniper Relay needs support for seasonal launch and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "improve review speed", "audience": "lean internal teams", "channels": [ "T...
{ "vertical": "health tech", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "TikTok", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the claim into so...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "TikTok", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset....
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0246
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Echoframe Media", "theme": "seasonal launch", "project_background": "Echoframe Media needs support for seasonal launch and wants work that feels clear and practical without losing practical clarity.", "business_goal": "improve review speed", "audience": "lean internal teams", "channels": [ "...
{ "vertical": "media tools", "tone": "clear and practical", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim into so...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset....
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0247
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Signal Oak", "theme": "ugc collection", "project_background": "Signal Oak needs support for ugc collection and wants work that feels clear and practical without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "marketing leads", "channels": [ "Instagram R...
{ "vertical": "health tech", "tone": "clear and practical", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Webinar follow-up", "reason": "Turns the c...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Webinar follow-up", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloatin...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0248
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Glowforge Labs", "theme": "event promo", "project_background": "Glowforge Labs needs support for event promo and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "improve review speed", "audience": "creator operators", "channels": [ "Email", ...
{ "vertical": "media tools", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Email", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Webinar follow-up", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across the a...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Email", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Webinar follow-up", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0249
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Tidal North Labs", "theme": "event promo", "project_background": "Tidal North Labs needs support for event promo and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "improve review speed", "audience": "busy founders", "channels": [ "LinkedIn"...
{ "vertical": "software", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim into so...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset....
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0250
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Northbeam Studio", "theme": "seasonal launch", "project_background": "Northbeam Studio needs support for seasonal launch and wants work that feels fast and witty without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "lean internal teams", "channels": [ ...
{ "vertical": "health tech", "tone": "fast and witty", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim i...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0251
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Signal Oak", "theme": "creator partnership", "project_background": "Signal Oak needs support for creator partnership and wants work that feels fast and witty without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "busy founders", "channels": [ "Landing...
{ "vertical": "fintech", "tone": "fast and witty", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Landing page", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the claim ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "Landing page", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0252
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Juniper Relay", "theme": "event promo", "project_background": "Juniper Relay needs support for event promo and wants work that feels expert and calm without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "busy founders", "channels": [ "Instagram Reels",...
{ "vertical": "wellness", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "TikTok", "reason": "Turns the claim into s...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "TikTok", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0253
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Harborline Works", "theme": "event promo", "project_background": "Harborline Works needs support for event promo and wants work that feels clear and practical without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "creator operators", "channels": [ "You...
{ "vertical": "fintech", "tone": "clear and practical", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "TikTok", "reason": "Turns the claim into so...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "TikTok", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset....
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0254
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Harborline Works", "theme": "seasonal launch", "project_background": "Harborline Works needs support for seasonal launch and wants work that feels expert and calm without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "creator operators", "channels": [ ...
{ "vertical": "wellness", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "TikTok", "reason": "Turns the claim into s...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "TikTok", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0255
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Signal Oak", "theme": "seasonal launch", "project_background": "Signal Oak needs support for seasonal launch and wants work that feels expert and calm without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "creator operators", "channels": [ "LinkedIn", ...
{ "vertical": "wellness", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into something...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." }, ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0256
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Lattice Harbor", "theme": "event promo", "project_background": "Lattice Harbor needs support for event promo and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "lean internal teams", "channels": [ "Yo...
{ "vertical": "travel", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into som...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset."...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0257
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Tidal North Labs", "theme": "ugc collection", "project_background": "Tidal North Labs needs support for ugc collection and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "improve review speed", "audience": "brand managers", "channels": [ "We...
{ "vertical": "beauty", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the c...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across the a...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloatin...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0258
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Orbit Thread", "theme": "event promo", "project_background": "Orbit Thread needs support for event promo and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "creator operators", "channels": [ "LinkedIn...
{ "vertical": "media tools", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0259
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Juniper Relay", "theme": "seasonal launch", "project_background": "Juniper Relay needs support for seasonal launch and wants work that feels fast and witty without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "creator operators", "channels": [ "Linked...
{ "vertical": "consumer hardware", "tone": "fast and witty", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "App onboarding", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "App onboarding", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0260
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Signal Oak", "theme": "event promo", "project_background": "Signal Oak needs support for event promo and wants work that feels expert and calm without losing practical clarity.", "business_goal": "improve review speed", "audience": "lean internal teams", "channels": [ "TikTok", "YouTube ...
{ "vertical": "software", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "TikTok", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the claim into so...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "TikTok", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset....
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0261
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Juniper Relay", "theme": "ugc collection", "project_background": "Juniper Relay needs support for ugc collection and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "improve review speed", "audience": "busy founders", "channels": [ "YouTube Sh...
{ "vertical": "travel", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "TikTok", "reason": "Turns the claim into so...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line acro...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "TikTok", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset....
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0262
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Glowforge Labs", "theme": "creator partnership", "project_background": "Glowforge Labs needs support for creator partnership and wants work that feels fast and witty without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "creator operators", "channels": [ ...
{ "vertical": "beauty", "tone": "fast and witty", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0263
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Echoframe Media", "theme": "new feature push", "project_background": "Echoframe Media needs support for new feature push and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "lean internal teams", "channel...
{ "vertical": "productivity", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proo...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0264
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Juniper Relay", "theme": "creator partnership", "project_background": "Juniper Relay needs support for creator partnership and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "busy founders", "channels": [...
{ "vertical": "wellness", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "App onboarding", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "App onboarding", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0265
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Lattice Harbor", "theme": "new feature push", "project_background": "Lattice Harbor needs support for new feature push and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "brand managers", "channels":...
{ "vertical": "creator education", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Landing page", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into somet...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "Landing page", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0266
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Velora Motion", "theme": "ugc collection", "project_background": "Velora Motion needs support for ugc collection and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "busy founders", "channels": [ ...
{ "vertical": "productivity", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "App onboarding", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "App onboarding", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0267
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Harborline Works", "theme": "event promo", "project_background": "Harborline Works needs support for event promo and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "creator operators", "channels": [ ...
{ "vertical": "media tools", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Landing page", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the claim ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Landing page", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0268
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Cinder Atlas", "theme": "creator partnership", "project_background": "Cinder Atlas needs support for creator partnership and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "brand managers", "channels": [ ...
{ "vertical": "consumer hardware", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Email", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim into somet...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "Email", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0269
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Orbit Thread", "theme": "new feature push", "project_background": "Orbit Thread needs support for new feature push and wants work that feels expert and calm without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "busy founders", "channels": [ "Email", ...
{ "vertical": "creator education", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Email", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "App onboarding", "reason": "Turns the claim into som...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "Email", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "App onboarding", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset."...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0270
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Velora Motion", "theme": "seasonal launch", "project_background": "Velora Motion needs support for seasonal launch and wants work that feels expert and calm without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "creator operators", "channels": [ "Email...
{ "vertical": "travel", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Email", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "LinkedIn", "reason": "Turns the claim into something...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Email", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "LinkedIn", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." }, ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0271
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Velora Motion", "theme": "seasonal launch", "project_background": "Velora Motion needs support for seasonal launch and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "improve review speed", "audience": "marketing leads", "channels": [ "A...
{ "vertical": "fintech", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Webinar follow-up", "reason": "Turns the cl...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across the a...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Webinar follow-up", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0272
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Lattice Harbor", "theme": "new feature push", "project_background": "Lattice Harbor needs support for new feature push and wants work that feels clear and practical without losing practical clarity.", "business_goal": "improve review speed", "audience": "marketing leads", "channels": [ "TikT...
{ "vertical": "productivity", "tone": "clear and practical", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "TikTok", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Webinar follow-up", "reason": "Turns the claim into...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line acro...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "TikTok", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Webinar follow-up", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ass...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0273
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Glowforge Labs", "theme": "ugc collection", "project_background": "Glowforge Labs needs support for ugc collection and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "improve review speed", "audience": "marketing leads", "channels": [ "Landi...
{ "vertical": "wellness", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Landing page", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Webinar follow-up", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across the a...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "Landing page", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Webinar follow-up", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0274
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Northbeam Studio", "theme": "ugc collection", "project_background": "Northbeam Studio needs support for ugc collection and wants work that feels expert and calm without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "creator operators", "channels": [ "W...
{ "vertical": "health tech", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the cl...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0275
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Signal Oak", "theme": "new feature push", "project_background": "Signal Oak needs support for new feature push and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "improve review speed", "audience": "creator operators", "channels": [ "YouTube ...
{ "vertical": "health tech", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0276
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "First Mile Creative", "theme": "new feature push", "project_background": "First Mile Creative needs support for new feature push and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "lean internal teams",...
{ "vertical": "consumer hardware", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Instagram Reels", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "Instagram Reels", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0277
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Northbeam Studio", "theme": "seasonal launch", "project_background": "Northbeam Studio needs support for seasonal launch and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "improve review speed", "audience": "creator operators", "channels": [ ...
{ "vertical": "travel", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into som...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across the a...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset."...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0278
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Velora Motion", "theme": "ugc collection", "project_background": "Velora Motion needs support for ugc collection and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "marketing leads", "channels": [ "Ap...
{ "vertical": "beauty", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "LinkedIn", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "LinkedIn", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0279
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Lattice Harbor", "theme": "ugc collection", "project_background": "Lattice Harbor needs support for ugc collection and wants work that feels clear and practical without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "busy founders", "channels": [ "YouTu...
{ "vertical": "beauty", "tone": "clear and practical", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "LinkedIn", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "LinkedIn", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0280
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "First Mile Creative", "theme": "seasonal launch", "project_background": "First Mile Creative needs support for seasonal launch and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "lean internal teams", "c...
{ "vertical": "fintech", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0281
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Cinder Atlas", "theme": "new feature push", "project_background": "Cinder Atlas needs support for new feature push and wants work that feels fast and witty without losing practical clarity.", "business_goal": "improve review speed", "audience": "busy founders", "channels": [ "Landing page", ...
{ "vertical": "productivity", "tone": "fast and witty", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Landing page", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Webinar follow-up", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line acro...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "Landing page", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Webinar follow-up", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0282
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Glowforge Labs", "theme": "creator partnership", "project_background": "Glowforge Labs needs support for creator partnership and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "busy founders", "channels": ...
{ "vertical": "media tools", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "App onboarding", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "App onboarding", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0283
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Glowforge Labs", "theme": "new feature push", "project_background": "Glowforge Labs needs support for new feature push and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "improve review speed", "audience": "busy founders", "channels": [ "Web...
{ "vertical": "productivity", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "busy founders", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the cl...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line acro...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "busy founders", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to the...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0284
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Echoframe Media", "theme": "new feature push", "project_background": "Echoframe Media needs support for new feature push and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "marketing leads", "channels": [...
{ "vertical": "consumer hardware", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Landing page", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "TikTok", "reason": "Turns the claim into some...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "Landing page", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "TikTok", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0285
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Juniper Relay", "theme": "ugc collection", "project_background": "Juniper Relay needs support for ugc collection and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "marketing leads", "channels": [ "La...
{ "vertical": "health tech", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Landing page", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Email", "reason": "Turns the claim into somet...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "Landing page", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Email", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0286
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Lattice Harbor", "theme": "seasonal launch", "project_background": "Lattice Harbor needs support for seasonal launch and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "lean internal teams", "channels": [ ...
{ "vertical": "media tools", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "App onboarding", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim i...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "App onboarding", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0287
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Cinder Atlas", "theme": "ugc collection", "project_background": "Cinder Atlas needs support for ugc collection and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "creator operators", "channels": [ "Web...
{ "vertical": "productivity", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0288
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Lattice Harbor", "theme": "new feature push", "project_background": "Lattice Harbor needs support for new feature push and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "brand managers", "channels": ...
{ "vertical": "productivity", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "TikTok", "reason": "Turns the claim into...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "TikTok", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ass...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0289
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Juniper Relay", "theme": "new feature push", "project_background": "Juniper Relay needs support for new feature push and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "lean internal teams", "channels...
{ "vertical": "travel", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "TikTok", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the claim into s...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "TikTok", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0290
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Echoframe Media", "theme": "seasonal launch", "project_background": "Echoframe Media needs support for seasonal launch and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "lean internal teams", "channe...
{ "vertical": "productivity", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "TikTok", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "LinkedIn", "reason": "Turns the claim into somethin...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "TikTok", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "LinkedIn", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." },...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0291
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Lattice Harbor", "theme": "ugc collection", "project_background": "Lattice Harbor needs support for ugc collection and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "lean internal teams", "channels":...
{ "vertical": "travel", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Email", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "LinkedIn", "reason": "Turns the claim into something...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "Email", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "LinkedIn", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." }, ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0292
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Velora Motion", "theme": "seasonal launch", "project_background": "Velora Motion needs support for seasonal launch and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "lean internal teams", "channels": [ ...
{ "vertical": "travel", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "LinkedIn", "reason": "Turns the claim into ...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "LinkedIn", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asse...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0293
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Lattice Harbor", "theme": "ugc collection", "project_background": "Lattice Harbor needs support for ugc collection and wants work that feels operator-sharp and concise without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "marketing leads", "channels": [ ...
{ "vertical": "fintech", "tone": "operator-sharp and concise", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "App onboarding", "reason": "Turns the claim...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof lin...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "App onboarding", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating th...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0294
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "Signal Oak", "theme": "ugc collection", "project_background": "Signal Oak needs support for ugc collection and wants work that feels premium and restrained without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "marketing leads", "channels": [ "YouTube ...
{ "vertical": "software", "tone": "premium and restrained", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Landing page", "reason": "Turns the claim i...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Landing page", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0295
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.88
{ "brand": "Echoframe Media", "theme": "ugc collection", "project_background": "Echoframe Media needs support for ugc collection and wants work that feels expert and calm without losing practical clarity.", "business_goal": "increase qualified replies", "audience": "marketing leads", "channels": [ "Webi...
{ "vertical": "software", "tone": "expert and calm", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "YouTube Shorts", "reason": "Turns the cl...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "increase qualified replies", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "YouTube Shorts", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0296
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.91
{ "brand": "Orbit Thread", "theme": "seasonal launch", "project_background": "Orbit Thread needs support for seasonal launch and wants work that feels fast and witty without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "creator operators", "channels": [ "YouTube ...
{ "vertical": "fintech", "tone": "fast and witty", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "creator operators", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "YouTube Shorts", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the clai...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The launch window is close enough that the first package must be reviewable immediately.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "creator operators", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to...
[ { "channel": "YouTube Shorts", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating t...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...
zarn_creative_brief_to_asset_plan_train_0297
train
easy
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.85
{ "brand": "Juniper Relay", "theme": "ugc collection", "project_background": "Juniper Relay needs support for ugc collection and wants work that feels playful and energetic without losing practical clarity.", "business_goal": "tighten launch sequencing", "audience": "brand managers", "channels": [ "Webi...
{ "vertical": "consumer hardware", "tone": "playful and energetic", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "brand managers", "attention_constraint": "low review bandwidth", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Webinar follow-up", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "TikTok", "reason": "Turns the claim into...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "The team has enough material, but not enough clarity on what to ship first.", "commercial_goal": "tighten launch sequencing", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line across ...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "brand managers", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to th...
[ { "channel": "Webinar follow-up", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "TikTok", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ass...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Easy rows for creative brief translation into asset system planning still require grounded execution, but the main blocker is explicit and the gold path is comparatively direct.
[ "high-context", "constraint-dense", "difficulty-easy", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0298
train
medium
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.93
{ "brand": "Orbit Thread", "theme": "ugc collection", "project_background": "Orbit Thread needs support for ugc collection and wants work that feels confident but low-hype without losing practical clarity.", "business_goal": "package one clearer offer", "audience": "lean internal teams", "channels": [ "...
{ "vertical": "travel", "tone": "confident but low-hype", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "lean internal teams", "attention_constraint": "executive skim behavior", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "LinkedIn", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "Instagram Reels", "reason": "Turns the claim into...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "package one clearer offer", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "lean internal teams", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned ...
[ { "channel": "LinkedIn", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "Instagram Reels", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the ass...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Medium rows for creative brief translation into asset system planning mix multiple constraints or artifact dependencies, so a strong answer has to stay coordinated rather than merely plausible.
[ "high-context", "constraint-dense", "difficulty-medium", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution." ]
{ "status": "starter-train-ready", "gold_candidate": false, "recommended_reviewers": 1, "adjudication_mode": "single-review-spot-check", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approval s...
zarn_creative_brief_to_asset_plan_train_0299
train
hard
Zarn
creative_brief
apache-2.0
zarnite-team-reviewed-gold-track-starter
0.89
{ "brand": "First Mile Creative", "theme": "ugc collection", "project_background": "First Mile Creative needs support for ugc collection and wants work that feels fast and witty without losing practical clarity.", "business_goal": "improve review speed", "audience": "marketing leads", "channels": [ "Ema...
{ "vertical": "productivity", "tone": "fast and witty", "must_keep": [ "clear value proposition", "one proof point", "one concise CTA" ], "must_avoid": [ "empty lifestyle language", "unsupported performance claims", "bloated launch scope" ] }
{ "primary": "marketing leads", "attention_constraint": "fast mobile consumption", "trust_builder": "Concrete proof beats generic ambition." }
[ { "asset": "founder notes", "quality": "messy but detailed", "best_use": "angle extraction" }, { "asset": "customer quote", "quality": "short but believable", "best_use": "proof or trust beat" }, { "asset": "product screenshots", "quality": "clean", "best_use": "visual su...
[ "Do not promise unsupported outcomes.", "Keep the first deliverable light enough to review in one pass.", "Flag anything that needs approval instead of smoothing over it.", "Keep the final plan consistent across all proposed deliverables." ]
{ "deliverables": [ { "priority": 1, "asset": "hero asset", "channel": "Email", "reason": "Unlocks feedback quickly while carrying the main promise." }, { "priority": 2, "asset": "proof asset", "channel": "TikTok", "reason": "Turns the claim into something t...
[ { "stage": "concept sign-off", "owner": "strategy lead", "purpose": "Lock the angle before production expands." }, { "stage": "draft review", "owner": "creative lead", "purpose": "Check whether the proof and hierarchy are still intact." }, { "stage": "stakeholder review", "ow...
[ "The plan can drift if the proof source is older than the current offer or campaign context.", "Too many channels too early may recreate the same review burden the package is meant to reduce.", "If approval-sensitive language is embedded in the hero asset, revisions will become slower and more expensive." ]
{ "primary_metric": "coverage_and_constraint_score", "secondary_metrics": [ "deliverable_fit", "qa_readiness", "dependency_clarity", "message_hierarchy_quality", "handoff_readiness" ], "automatic_failures": [ "Misses the stated proof requirement", "Ignores approval-sensitive constrai...
{ "why_now": "Stakeholder patience is thinning, so the first pass has to feel focused and useful.", "commercial_goal": "improve review speed", "core_tension": "The team needs enough structure to ship, but not so much scope that the review cycle expands again.", "proof_strategy": "Use one central proof line acro...
[ { "level": 1, "message": "Lead with the operational promise, not the process description.", "why": "This gives the audience a reason to care immediately." }, { "level": 2, "message": "A smaller first pass made review faster and clearer for the whole team.", "why": "The proof line is the ...
[ { "segment": "marketing leads", "need": "Fast signal that the asset will be useful before it becomes another thing to review.", "trigger": "concrete proof plus low-hype tone" }, { "segment": "secondary internal stakeholder", "need": "Confidence that the package is reviewable and aligned to t...
[ { "channel": "Email", "job": "carry the main promise", "format_note": "This is the hero surface that sets the tone for the rest of the package." }, { "channel": "TikTok", "job": "surface the proof", "format_note": "Make the evidence impossible to miss without bloating the asset." }, ...
[ { "stage": "brief approval", "owner": "strategy lead", "standard": "The angle and proof are locked before production expands." }, { "stage": "asset review", "owner": "creative lead", "standard": "The hero asset, proof asset, and CTA asset remain aligned." }, { "stage": "stakehold...
{ "hero_angle": "The best asset plan treats the first release as a scoped proof package, not as the whole campaign.", "asset_matrix": [ { "asset_type": "hero asset", "primary_job": "make the promise obvious", "must_keep": "tone plus proof line" }, { "asset_type": "proof asset", ...
[ "The output names what ships first, why it ships first, and what should wait.", "Message hierarchy and asset plan stay consistent across channels.", "Approval ownership is visible enough that the work can move without a second planning pass." ]
{ "modality": "brief-plus-asset-context", "brief_surfaces": [ "creative_brief", "brand_context", "audience_profile", "available_assets" ], "review_stages": [ "concept sign-off", "draft review", "stakeholder review", "final QA" ], "risk_pressure": [ "The plan can drift if ...
[ { "label": "hero-first package", "rationale": "Acceptable when the plan leads with the hero asset and compresses the downstream support assets into fewer deliverables.", "outputs": { "asset_priority": "hero asset first", "channel_bias": "highest-attention channel gets the clearest proof asse...
[ { "label": "brainstorm masquerading as plan", "why_bad": "Produces ideas without naming what ships first or who approves it.", "conflicting_rule": "The first asset should be clearly prioritized and justified." }, { "label": "message drift", "why_bad": "Changes the core promise as assets move...
Hard rows for creative brief translation into asset system planning contain ambiguity, adversarial traps, and high-cost failure modes, so the example tests more than surface fluency and is intended to stress the benchmark slices.
[ "high-context", "constraint-dense", "difficulty-hard", "message-hierarchy", "asset-prioritization", "approval-path", "channel-fit", "dependency-handoff", "stress-case" ]
[ "competing-stakeholder-priorities", "channel-specific-constraint-carryover", "message-order-drift", "unclear-first-asset", "multi-constraint-pressure" ]
[ "Produces a brainstorm instead of a production-ready asset plan.", "Lets the message hierarchy drift between channels.", "Hides approval ownership or dependencies that would block execution.", "Collapses several real constraints into a generic polished answer that sounds smoother than the source allows." ]
{ "status": "starter-train-ready", "gold_candidate": true, "recommended_reviewers": 2, "adjudication_mode": "dual-review-plus-adjudication", "required_checks": [ "The first asset is clearly prioritized and commercially justified.", "Message hierarchy stays stable across the asset family.", "Approv...