eva_number
int64
1
371
country
stringclasses
2 values
crew
stringlengths
8
40
vehicle
stringlengths
5
31
date
timestamp[ns]date
1965-06-03 00:00:00
2013-08-22 00:00:00
duration
stringlengths
4
4
purpose
stringlengths
24
652
duration_minutes
float64
0
536
281
Russia
Anatoli Solovyov Sergei Avdeyev
Soyuz TM-15 Mir
1992-09-11T00:00:00
5:44
Install thruster box on Sofora truss and deploy to ops pos
344
282
Russia
Anatoli Solovyov Sergei Avdeyev
Soyuz TM-15 Mir
1992-09-15T00:00:00
3:33
Move Kurs antenna on Kristall. Retrieve science
213
66
USA
Greg Harbaugh Mario Runco
STS-54
1993-01-17T00:00:00
4:28
Evaluate training vs. flight differences (DTO 1210). Encumbered translations. Foot restraint ingress. Inspected/avoided misfired IUS tilt table superzip. Almost lost untethered IUS tilt table equipment.
268
283
Russia
Gennady Manakov Alexandr Poleshchuk
Soyuz TM-16 Mir 15
1993-04-19T00:00:00
5:25
Relocated solar array control base from Kristall to Kvant-1. Vent problem in 1 suit, crane handle lost
325
284
Russia
Gennady Manakov Alexandr Poleshchuk
Soyuz TM-16 Mir 15
1993-06-18T00:00:00
4:32
Relocated second solar array base from Kristall to Kvant-1
272
67
USA
David Low Jeff Wisoff
STS-57
1993-06-25T00:00:00
5:50
First egress/ingress involving tunnel adapter. Pushed on 2 EURECA antennas to aid stowage. Evaluated training vs. flight differences (DTO 1210, large mass handling from RMS, high torque bolts, ORU fine align from RMS with active orbiter jets)
350
68
USA
Carl Walz Jim Newman
STS-51
1993-09-16T00:00:00
7:05
Evaluate training vs. flight differences (DTO 1210). Evaluated HST servicing mission tools. Tool box door jammed temporarily preventing closure
425
285
Russia
Valeri Tsibliyev Alexandr Serebrov
Soyuz TM-17 Mir 16
1993-09-16T00:00:00
4:19
Install stowed Rapana small truss on Kvant1. Install material samples (Indikator, Plenka5, Strakhovka)
259
286
Russia
Valeri Tsibliyev Alexandr Serebrov
Soyuz TM-17 Mir 16
1993-09-20T00:00:00
3:13
Deploy Rapana small truss with material samples
193
287
Russia
Valeri Tsibliyev Alexandr Serebrov
Soyuz TM-17 Mir 16
1993-09-28T00:00:00
1:51
Inspect for Perseid meteor shower damage. Place Danko-M construction materials for exposure. Retrieve one TREK panel. Cooling system failure in T's suit shortens EVA
111
69
USA
Story Musgrave Jeff Hoffman
STS-61 / HST-1
1993-12-04T00:00:00
7:54
HST servicing (RSU, ECU, solar array prep). RSU bay doors difficult to close.
474
70
USA
Tom Akers Kathy Thornton
STS-61 / HST-1
1993-12-05T00:00:00
6:36
HST servicing (2 solar arrays). One jettisoned due to pre-EVA damage
396
71
USA
Story Musgrave Jeff Hoffman
STS-61 / HST-1
1993-12-06T00:00:00
6:47
HST servicing (WFPC 1/2)
407
72
USA
Tom Akers Kathy Thornton
STS-61 / HST-1
1993-12-07T00:00:00
6:50
HST servicing (HSP/COSTAR)
410
73
USA
Story Musgrave Jeff Hoffman
STS-61 / HST-1
1993-12-08T00:00:00
7:21
HST servicing (SADE, magnetometers, GHRS)
441
291
Russia
Yuri Malenchenko Talgat Musabeyev
Soyuz TM-18 Mir 17
1994-09-13T00:00:00
6:05
Inspect Kristall solar arrays before retraction/move to Kvant-1. Tighten restraint bolts for Sofora and solar array bases. Mount amateur radio antenna. Retrieve Rapana science samples.
365
74
USA
Mark Lee Carl Meade
STS-64
1994-09-16T00:00:00
6:51
SAFER self rescue demo, test new tools
411
75
USA
Mike Foale Bernard Harris
STS-63
1995-02-09T00:00:00
4:39
Cold environment eval, large object handling eval using SPARTAN (EDFT-01)
279
292
Russia
Vladimir Dezhurov Gennady Strekalov
Soyuz TM-19 Mir 18
1995-05-12T00:00:00
6:08
Install electrical cables and adjust solar array actuators on Kvant-1. Practice folding 3 solar array panels on Kristall
368
293
Russia
Vladimir Dezhurov Gennady Strekalov
Soyuz TM-19 Mir 18
1995-05-17T00:00:00
6:50
Fold one Kristall solar array, move it to Kvant-1 using cargo crane, tie off temporarily
410
294
Russia
Vladimir Dezhurov Gennady Strekalov
Soyuz TM-19 Mir 18
1995-05-22T00:00:00
5:15
Fold all but 10 feet of second Kristall solar array and finish installing other array on Kvant-1
315
295
Russia
Vladimir Dezhurov Gennady Strekalov
Soyuz TM-19 Mir 18
1995-05-29T00:00:00
0:21
Move base block docking port for Kristall move
21
296
Russia
Vladimir Dezhurov Gennady Strekalov
Soyuz TM-19 Mir 18
1995-06-16T00:00:00
0:23
Move base block docking port in prep for Spektr docking
23
297
Russia
Anatoly Solovyev Nikola Budarin
Soyuz TM-20 Mir 19
1995-07-14T00:00:00
5:34
Cut launch restraint of Spektr solar array with U.S. tool, resecure amateur radio antenna, retether cargo crane to free Kvant-2 solar array
334
298
Russia
Anatoly Solovyev Nikola Budarin
Soyuz TM-20 Mir 19
1995-07-19T00:00:00
3:06
Recover TREK. Install Komplast. Recover SKK-4, SKK-12, Platan, Stuk. H2O cooling problem on one suit prevented Miras installation
186
299
Russia
Anatoly Solovyev Nikola Budarin
Soyuz TM-20 Mir 19
1995-07-21T00:00:00
5:44
Deploy Miras, shake Spektr solar array to attempt deploy of end panel. Resecure amateur radio antenna. Open Elektron O2 system valve
344
76
USA
Jim Voss Mike Gernhardt
STS-69
1995-09-16T00:00:00
6:46
ISS task board with worksite interface samples. Elec cuff checklist demo. Thermal cube experiment
406
304
Russia
Yuri Onufrenko Yuri Usachev
Soyuz TM-23 Mir 21
1996-05-21T00:00:00
5:20
Relocate cooperative array from DM to Kvant-1. Pepsi mockup photography
320
305
Russia
Yuri Onufrenko Yuri Usachev
Soyuz TM-23 Mir 21
1996-05-24T00:00:00
5:43
Install 1/2 of cooperative array cables on Kvant1
343
306
Russia
Yuri Onufrenko Yuri Usachev
Soyuz TM-23 Mir 21
1996-05-30T00:00:00
4:20
Deploy MOMS experiment on Priroda. Open exp covers
260
307
Russia
Yuri Onufrenko Yuri Usachev
Soyuz TM-23 Mir 21
1996-06-06T00:00:00
3:34
Deploy U.S. PIE/MSRE experiments on Kvant-2. Replace Komza cassettes. Install SKK-11. Pepsi mockup photography
214
308
Russia
Yuri Onufrenko Yuri Usachev
Soyuz TM-23 Mir 21
1996-06-13T00:00:00
5:42
Manually assist Priroda Travers antenna. Tighten Sofora truss fasteners. Retrieve samples and secure Rapana truss to Sofora. Install and deploy Ferma-3 truss experiment
342
311
Russia
Valeri Tsibliev Jerry Linenger
Soyuz TM-25 Mir 23
1997-04-29T00:00:00
4:57
Deploy OPM and TLD/Benton dosimeters. Retrieve PIE and MSRE. Use U.S. EVA tether and 35mm camera. First use of new Orlan M suits
297
312
Russia
Anatoly Solovyev Pavel Vinogradov
Soyuz TM-26 Mir 24
1997-08-21T00:00:00
5:30
Connect solar array power cables inside Spektr. Inspect Spektr interior for leaks. Retrieve science and personal hardware from Spektr.
330
313
Russia
Anatoly Solovyev Mike Foale
Soyuz TM-26 Mir 24
1997-09-06T00:00:00
6:00
Inspect Spektr exterior for leak sites (video under radiator and measure gap around solar array base). Rotate 2 Spektr solar arrays. Retrieve Benton dosimeter.
360
314
Russia
Anatoly Solovyev Pavel Vinogradov
Soyuz TM-26 Mir 24
1997-10-20T00:00:00
6:10
Connect 2 of 3 solar array orientation cables inside Spektr.
370
315
Russia
Anatoly Solovyev Pavel Vinogradov
Soyuz TM-26 Mir 24
1997-11-03T00:00:00
6:05
Release Sputnik anniversary satellite. Tiedown old solar array from Kvant-1 to base block. Install Vozduk CO2 system external cap. Retrieve base block solar array sample. Retrieve/deploy Kvant-2 science. Kvant-2 outer hatch leaks. Ingress via backup airlock.
365
316
Russia
Anatoly Solovyev Pavel Vinogradov
Soyuz TM-26 Mir 24
1997-11-06T00:00:00
6:19
Transfer new solar array from docking module to Kvant-1. First handoff of stowed array from one crane to second. Remove Vozduk external cap and install outlet diffuser. Kvant-2 outer hatch inspected then sealed with aid of backup bolts.
379
86
USA
Winston Scott Takao Doi
STS-87
1997-11-24T00:00:00
7:43
Manual capture and berthing (with RMS aid) of Spartan. Test of ISS crane with large battery/carrier. Test of ISS power tool and torque multiplier
463
87
USA
Winston Scott Takao Doi
STS-87
1997-12-03T00:00:00
4:59
Test of ISS crane with small ORU’s. Deploy and capture of SPRINT/AERCAM robotic freeflyer
299
317
Russia
Anatoly Solovyev Pavel Vinogradov
Soyuz TM-26 Mir 24
1998-01-09T00:00:00
3:06
Retrieve U.S. OPM experiment from docking module. Kvant-2 hatch inspected, videotaped and bolted closed.
186
318
Russia
Anatoly Solovyev Dave Wolf
Soyuz TM-26 Mir 24
1998-01-14T00:00:00
3:52
Use SPSR experiment on Kvant-2 radiator. Kvant-2 airlock hatch inspected and bolted closed
232
319
Russia
Talgat Musabeyev Nikola Budarin
Soyuz TM-27 Mir 25
1998-03-03T00:00:00
0:00
Manual wrenches inadequate to release hatch bolts. Spektr solar array reinforcement deferred.
0
320
Russia
Talgat Musabeyev Nikola Budarin
Soyuz TM-27 Mir 25
1998-04-01T00:00:00
6:26
Install handrails and foot restraints on Spektr around damaged solar array.
386
321
Russia
Talgat Musabeyev Nikola Budarin
Soyuz TM-27 Mir 25
1998-04-06T00:00:00
4:23
Reinforce Spektr solar array. Retrieve Komza
263
322
Russia
Talgat Musabeyev Nikola Budarin
Soyuz TM-27 Mir 25
1998-04-11T00:00:00
6:25
Jettison VDU roll thruster package from Sofora top
385
323
Russia
Talgat Musabeyev Nikola Budarin
Soyuz TM-27 Mir 25
1998-04-17T00:00:00
6:33
Prepare new VDU for Sofora mating. Clear Ferma-3 & Rapana trusses. Tighten Sofora bolts
393
324
Russia
Talgat Musabeyev Nikola Budarin
Soyuz TM-27 Mir 25
1998-04-22T00:00:00
6:21
Install new VDU on Sofora and erect to vertical pos. Jettison of ???????
381
325
Russia
G. Padelka Sergei Avdeyev
Soyuz TM-28 Mir 26
1998-09-15T00:00:00
0:30
Internal EVA inside Spektr to connect solar array orientation cable in response to avionics failure.
30
326
Russia
G. Padelka Sergei Avdeyev
Soyuz TM-28 Mir 26
1998-11-10T00:00:00
5:50
Manual launch of Sputnik demo satellite. Install Dvikon suit material exposure experiment on base block Igla antenna. Retrieve bagged sample after thruster exhaust exposure. Attach and deploy experimental solar array on docking module trunnion. Replace thermal blanket over pwr connectors. Retrieve Keramika, Danko, Soly...
350
88
USA
Jerry Ross Jim Newman
STS-88/2A
1998-12-07T00:00:00
7:21
Connect PMA1-FGB power cables and PMA1/2-Node1 APAS cables
441
89
USA
Jerry Ross Jim Newman
STS-88/2A
1998-12-09T00:00:00
7:02
Install 2 early comm antennas and cables
422
90
USA
Jerry Ross Jim Newman
STS-88/2A
1998-12-12T00:00:00
6:59
Deploy 2 US foot restraints and a tool stanchion. Aid release of 2 FGB Toru antennas, install FGB aft handrail and reinstall FGB Komplast panel. SAFER self rescue demo (DTO 689)
419
327
Russia
Victor Afanasyev Jean-Pierre Heignere
Soyuz TM-29 Mir 27
1999-04-16T00:00:00
6:19
Attempted demo of leak repair device failed due to valve failure. Deployed organic material exposure experiment and retrieved French MMOD experiment. Manual launch of Sputnik demo satellite.
379
91
USA
Tammy Jernigan Dan Barry
STS-96/2A.1
1999-05-29T00:00:00
7:55
Transfer and externally install US and Russian cargo cranes, 2 common foot restraints, 3 EVA tool bags. Lost retractable equip tether
475
328
Russia
Victor Afanasyev Sergei Avdeyev
Soyuz TM-29 Mir 27
1999-07-23T00:00:00
6:07
Installed a new experimental 6-meter diameter antenna on Sofora truss but failed to deploy it fully. Unsuccessfully sought source of small leak in Kvant-2 atmosphere. Retrieved the Exobiology and Dvikon experiments.
367
329
Russia
Victor Afanasyev Sergei Avdeyev
Soyuz TM-29 Mir 27
1999-07-28T00:00:00
5:22
Finished full deploy of an experimental 6-meter antenna on Sofora truss. At the end of the experiment the antenna was jettisoned. Also installed experiments Indicator and Sprut-4, changed the cassettes of the Migmas ion spectrometer and retrieved Danko-M and Ekran-D experiments. Problem with suit cooling ended EVA.
322
92
USA
Steve Smith John Grunsfeld
STS-103/ HST-3A
1999-12-22T00:00:00
8:15
HST servicing (RSU gyros and volt/temp improvement kits for batteries)
495
93
USA
Mike Foale Claude Nicollier
STS-103/ HST-3A
1999-12-23T00:00:00
8:10
HST servicing (486 computer and fine guidance sensor)
490
94
USA
Steve Smith John Grunsfeld
STS-103/ HST-3A
1999-12-24T00:00:00
8:08
HST servicing (transmitter and solid state recorder)
488
330
Russia
Sergei Zaletin Alexander Kaleri
Soyuz TM-30 Mir 28
2000-05-12T00:00:00
5:30
Inspected and photographed short circuit damaged solar array cable on Kvant-1. Tested module leak repair sealant on sample panel. Retrieved a solar array test sample from the docking module. Conducted general inspection/photography of health of Mir exterior (panorama)
330
95
USA
Jeff Williams Jim Voss
STS-101/2A.2a
2000-05-21T00:00:00
6:44
Resecure and reorient U.S. crane. Assemble complete Russian crane and transfer from PMA 2 to PMA 1. Replace stbd ECOM antenna. Install 8 handrails on Node 1 (APAS cable blocked one nominal site). Cables cleared from Node 1 SVS targets. Lost PAD
404
96
USA
Edward Lu Yuri Malenchecko
STS-106/2A.2b
2000-09-11T00:00:00
6:14
SM docking target deployment completed manually. Attitude control magnetometer and nearby translation aid gap spanner installed. SM-FGB cables routed, secured and connected (EPS, TV-C&DH and Orlan comm). Photos captured of partially deployed SM solar array section to aid future resolution.
374
97
USA
Leroy Chiao Bill McArthur
STS-92/3A
2000-10-15T00:00:00
6:28
Z1 SASA antenna deployed. DDCU thermal shrouds removed/stowed. One tool box relocated from PLB to Z1. Z1-Node1 cables mated. SGANT antenna dish and boom deployed.
388
98
USA
Jeff Wisoff Mike Lopez-Alegria
STS-92/3A
2000-10-16T00:00:00
7:07
PMA3 released from PLB. PMA3-Node1 cables mated.
427
99
USA
Leroy Chiao Bill McArthur
STS-92/3A
2000-10-17T00:00:00
6:48
Z1 DDCU-HP (2) transferred from PLB to Z1. Z1 keel relocated. Z1-P6 launch locks released. PMA2-Z1 cables reconfigured. 2nd tool box relocated from PLB to Z1. Airlock depress valve cover lost
408
100
USA
Jeff Wisoff Mike Lopez-Alegria
STS-92/3A
2000-10-18T00:00:00
6:56
Z1 FRGF stowed and utility tray deployed. Tethered demo of self rescue SAFER hardware (DTO 689).
416
101
USA
Joe Tanner Carlos Noriega
STS-97/4A
2000-12-03T00:00:00
7:33
Assisted P6-Z1 mechanical mating. Mated 9 Z1-P6 electrical power cables. Released 2 sets of solar array blanket boxes and gimbal linkages. Used tensioning devices to secure 3 of 4 gimbal linkage bolts. Released PV radiator launch restraints and thermal sensors.
453
102
USA
Joe Tanner Carlos Noriega
STS-97/4A
2000-12-05T00:00:00
6:37
Removed/stowed Z1's ACBSP and DDCU-HP thermal shrouds. Relocated SASA antenna from Z1 to IEA. Inspected tensioning mechanism of incompletely deployed solar array. Rerouted Z1 patch panel cables. Mated 4 Z1-P6 ammonia lines. Disconnected PMA2 cables from Node1. Stowed EPS cable bag on P6. Released P6 aft radiator launch...
397
103
USA
Joe Tanner Carlos Noriega
STS-97/4A
2000-12-07T00:00:00
5:10
Reseated solar array tensioning cable to allow full deployment. Installed FPP antennas on IEA and Node1. Installed Node1 centerline camera cable. Released P6 stbd radiator launch restraints and thermal sensors. Stowed P6 and Z1 WIS antennas.
310
104
USA
Tom Jones Bob Curbeam
STS-98/5A
2001-02-10T00:00:00
7:34
Disconnect lab-Shuttle LTA heater cable. Remove and stow lab module CBM cover. Connect 4 ammonia lines and elec cables btw lab and Z1. M3 QD leaked NH3 on crew to force bakeout cleanup
454
105
USA
Tom Jones Bob Curbeam
STS-98/5A
2001-02-12T00:00:00
6:50
Connect lab-PMA2 APAS cables. Install lab vent valve, trunnion pin covers, handrails, PDGF, VSC and window cover. Wrong bolt heads on vent cover
410
106
USA
Tom Jones Bob Curbeam
STS-98/5A
2001-02-14T00:00:00
5:25
Spare SASA antenna installed on Z1. Demo of incapacitated crew rescue.
325
107
USA
Jim Voss Susan Helms
STS-102/5A.1
2001-03-10T00:00:00
8:56
Disconnected PMA3 from Node1 electrical cables. Installed cradle on lab in prep for SSRMS and S0 truss. Installed rigid umbilical. Last 2 hours spent in airlock waiting on RMS install of MPLM. PAD lost
536
108
USA
Paul Richards Andy Thomas
STS-102/5A.1
2001-03-12T00:00:00
6:21
Removed and stowed port early comm antenna. Installed the external stowage platform on a lab trunnion. Transfered a pump flow control system ORU ready for future replacement. Inspected P6 solar array 4 bar linkage, FPP, NPV and connector J612
381
109
USA
Scott Parazynski Chris Hadfield
STS-100/6A
2001-04-22T00:00:00
7:10
Transfered and installed UHF antenna on lab. Released SSRMS launch restraints, unfold booms and secure joints. Connected cables from lab to SSRMS pallet for initial robot arm ops
430
110
USA
Scott Parazynski Chris Hadfield
STS-100/6A
2001-04-24T00:00:00
7:40
Connected 8 cables for lab based SSRMS ops. Demated cables btw lab and SSRMS pallet. Removed and stowed stbd early comm antenna. 1.5 hours spent in fruitless search for early comm conn parts under CBM cover. Transfered spare DCSU to lab stowage pallet
460
331
Russia
Yuri Usachev Jim Voss
ISS Incr-2
2001-06-08T00:00:00
0:19
Relocated SM docking port as prep for DC1 docking. Tested Orlan suits launched with SM.
19
111
USA
Mike Gernhardt Jim Reilly
STS-104/7A
2001-07-14T00:00:00
5:59
Shuttle based EVA. Airlock-Node1 CBM cover removed. LTA heater cable demated. Waited on umbilicals for airlock transfer and install by SSRMS. Connected airlock heater cable.
359
112
USA
Mike Gernhardt Jim Reilly
STS-104/7A
2001-07-17T00:00:00
6:29
Shuttle based EVA. 3 of 4 high pressure gas tanks installed on airlock
389
113
USA
Mike Gernhardt Jim Reilly
STS-104/7A
2001-07-20T00:00:00
4:02
First EVA based from ISS joint airlock. 4th high pressure gas tank installed. Installed thermal cover over airlock FRGF and several airlock handrails. Mated FGB-airlock cable for Russian suit comm. Inspected BMRRM and FPP on top of P6.
242
114
USA
Dan Barry Patrick Forrester
STS-105/7A.1
2001-08-16T00:00:00
6:16
Shuttle based EVA. Installed early ammonia servicer on P6 truss and mated its cables. Attached 2 MISSE materials experiments to airlock exterior.
376
115
USA
Dan Barry Patrick Forrester
STS-105/7A.1
2001-08-18T00:00:00
5:29
Shuttle based EVA. Installed 10 handrails on Lab. Attached LTA heater cables on lab for later use with S0.
329
332
Russia
Vladimir Dezhurov Mikhail Tyurin
ISS Incr-3
2001-10-08T00:00:00
4:58
First EVA from DC-1. Installed Tranzit-B cable for EVA radio communications between the SM and DC-1. Installed 4 hatch handrails, egress/ingress ladder, MLI, video camera and Strela crane operator post/boom on DC-1. Installed Kurs antennas and docking target. Confirmed deployment of 4 Kurs active antennas. As planned, ...
298
333
Russia
Vladimir Dezhurov Mikhail Tyurin
ISS Incr-3
2001-10-15T00:00:00
5:52
Installed Kromka at SM port location. Installed Japanese contracted MPAC-SEEDS materials experiments (3) on outside of SM. Replaced Russian flag placard with Kodak sign (material durability tests). EVA hatch was briefly stuck in temp stow position. Orlan gloves bagged post EVA.
352
334
Russia
Vladimir Dezhurov Frank Culbertson
ISS Incr-3
2001-11-12T00:00:00
5:04
DC1-SM hatch leaked during initial depress. Wipe of seals and reclosure resolved leak (30 minute delay). Connected Kurs cables (4 hi freq and 3 low freq) outside Pirs DC-1. Installed tether between DC1 egress ladder and SM. Completed checks of the Strela crane. Inspected and photographed a partially deployed panel of S...
304
335
Russia
Vladimir Dezhurov Mikhail Tyurin
ISS Incr-3
2001-12-03T00:00:00
2:46
Removed debris on SM aft port that prevented Progress vehicle #6 from completing hard dock. Photoed and removed Progress #5 seal debris.
166
116
USA
Linda Godwin Dan Tani
STS-108/UF1
2001-12-10T00:00:00
4:12
Shuttle based EVA. Installed 2 beta gimbal assy (BGA) thermal blankets. Retrieved SASA shroud. Inspected DCSU. Failed attempt to lock 4th leg of BGA four bar assembly.
252
336
Russia
Yri Onufrienko Carl Walz
ISS Incr-4
2002-01-14T00:00:00
6:03
Relocated a cargo boom for the Russian Strela crane from PMA-1 to Pirs DC-1. Installed amateur radio antenna WA3 and cables onto the aft of SM. Jettisoned gloves and wiping towels?
363
337
Russia
Yuri Onufrienko Dan Bursch
ISS Incr-4
2002-01-25T00:00:00
5:59
Installed 6 thruster deflector shields on SM. Installed an amateur radio antenna (WA4) and retrieved/ replaced Kromka device to measure thruster deposits. Installed 1 Platan-M radiation experiment and 3 SKK materials experiments.
359
117
USA
Carl Walz Dan Bursch
Incr-4
2002-02-20T00:00:00
5:49
First use of the Quest airlock without Shuttle docked. 8A preps included tool retrieval/relocation, DDCU checkout, Z1 Shroud removal, Grapple Fixture Adapter removal, securing HPGT latches, photos of MISSE & MMOD hits.
349
118
USA
John Grunsfeld Rick Linnehan
STS-109/ HST-3B
2002-03-04T00:00:00
7:01
HST servicing. Replaced 1 of 2 solar arrays and its diode box.
421
119
USA
Jim Newman Mike Massimino
STS-109/ HST-3B
2002-03-05T00:00:00
7:16
HST servicing. Replaced 2nd solar array and its diode box. Replaced gyro reaction wheel assy #1.
436
120
USA
John Grunsfeld Rick Linnehan
STS-109/ HST-3B
2002-03-06T00:00:00
6:48
HST servicing. Replaced power control unit (PCU). HST handrails inspected.
408
121
USA
Jim Newman Mike Massimino
STS-109/ HST-3B
2002-03-07T00:00:00
7:30
HST servicing. Replaced faint object camera (FOC) with advanced camera. Installed electronics support module in aft shroud. Completed PCU cleanup.
450
122
USA
John Grunsfeld Rick Linnehan
STS-109/ HST-3B
2002-03-08T00:00:00
7:20
HST servicing. Installed NICMOS cryo cooler and radiator. Installed new outer thermal blankets.
440
123
USA
Steve Smith Rex Walheim
STS-110/8A
2002-04-11T00:00:00
7:48
ISS based EVA. Lab-SO cables connected. Aft tray req'd 2 crew to deploy. Lab-S0 fwd struts installed.
468
124
USA
Jerry Ross Lee Morin
STS-110/8A
2002-04-13T00:00:00
7:30
ISS based EVA. Lab-SO cables connected. Lab-S0 aft struts installed.
450
125
USA
Steve Smith Rex Walheim
STS-110/8A
2002-04-14T00:00:00
6:27
ISS based EVA. Released Lab-S0 adapter latch. Connected MT cables. Released MT launch restraints. Removed MT radiator cover. TUS 2 safing bolt problem.
387
126
USA
Jerry Ross Lee Morin
STS-110/8A
2002-04-16T00:00:00
6:37
ISS based EVA. Installed S0-airlock handrail spur. Installed handrails and 2 CETA lights on S0. Deployed CETA energy absorbers. Removed/stowed S0 keel and drag link. J400 reconfigured. CID 7/8 installed. Failed Trace Gas Analyzer DTO.
397