eva_number
int64
1
371
country
stringclasses
2 values
crew
stringlengths
8
40
vehicle
stringlengths
5
31
date
timestamp[ns]date
1965-06-03 00:00:00
2013-08-22 00:00:00
duration
stringlengths
4
4
purpose
stringlengths
24
652
duration_minutes
float64
0
536
127
USA
F. Chang-Diaz Philippe Perrin
STS-111/UF2
2002-06-09T00:00:00
7:14
ISS based EVA. PDGF installed on P6. SM MMOD panels stowed on PMA1. MBS blankets removed as prep for MBS install onto MT.
434
128
USA
F. Chang-Diaz Philippe Perrin
STS-111/UF2
2002-06-11T00:00:00
5:00
ISS based EVA. MT-MBS cables connected and MT-MBS bolts mated. POA deployed. Zenith TUS safing bolt. MBS camera relocated.
300
129
USA
F. Chang-Diaz Philippe Perrin
STS-111/UF2
2002-06-13T00:00:00
7:16
ISS based EVA. SSRMS wrist joint replaced. Failed joint stowed on Shuttle.
436
338
Russia
Valery Korzun Peggy Whitson
ISS Incr-5
2002-08-16T00:00:00
4:25
EVA delayed 1:43 due to missed opening of primary O2 bottles in both suits. Removed 6 MMOD shield panels from PMA-1 and installed them on SM. Deferred EVA tasks for swab of fuel/oxidizer residue and installation of Kromka experiment.
265
339
Russia
Valery Korzun Sergei Treschev
ISS Incr-5
2002-08-26T00:00:00
5:21
Installed ORU attachment frame outside FGB to house components for EVA assembly tasks. Retrieved and replaced panel #1 of Japan's MPAC/SEEDs materials experiments outside SM. Installed 4 fairleads on FGB for future routing of tethers. Added two ham radio antennas on SM (WA1 & WA2). Replaced the earlier deferred Kromka ...
321
130
USA
Dave Wolf Piers Sellers
STS-112/9A
2002-10-10T00:00:00
7:01
ISS based EVA. S1-S0 cables and fluid lines connected. S-band antenna deployed. S1 radiator restraints released. CETA cart launch locks released. S1 camera installed.
421
131
USA
Dave Wolf Piers Sellers
STS-112/9A
2002-10-12T00:00:00
6:04
ISS based EVA. Lab camera installed. S1 radiator restraints released. S1-S0 cables and fluid lines connected. SPD installed at Z1-P6. CETA cart launch locks released. NH3 tank cables attached.
364
132
USA
Dave Wolf Piers Sellers
STS-112/9A
2002-10-14T00:00:00
6:36
ISS based EVA. MT IUA replaced. S0-S1 NH3 jumpers connected. S1-S0 cables and fluid lines connected. S1 drag link stowed. SPD's installed on NH3 lines.
396
133
USA
Mike Lopez-Alegria John Herrington
STS-113/11A
2002-11-26T00:00:00
6:45
ISS based EVA. P1-S0 cables connected. CETA cart launch locks released. P1 drag link stowed. Spool positioning devices (SPD) installed. Wireless external transceiver assy (WETA) installed on Node 1 for EVA helmet video.
405
134
USA
Mike Lopez-Alegria John Herrington
STS-113/11A
2002-11-28T00:00:00
6:10
ISS based EVA. P1-S0 fluid lines connected. P1 keels stowed. Wireless external transceiver assy (WETA) installed on P1. CETA cart relocated from P1 to S1.
370
135
USA
Mike Lopez-Alegria John Herrington
STS-113/11A
2002-11-30T00:00:00
7:00
ISS based EVA. SPD's installed. MBSU cables reconfigured. NH3 tank lines attached. UHF antenna deployed (MT ran into stowed UHF antenna resulting in early deploy). SO DDCU cover installed.
420
136
USA
Ken Bowersox Don Pettit
Incr-6
2003-01-15T00:00:00
6:51
ISS based EVA. Removed debris from Node nadir CBM. Released P1 truss radiator launch locks (10) to allow deploy. Failed to install CETA light on S1 (jammed in launch bracket). Measured the Early Ammonia Servicer (EAS) reservoir. Retrieved tools from Z1 and airlock tool boxes for future. Cut away thermal cover strap tha...
411
137
USA
Ken Bowersox Don Pettit
Incr-6
2003-04-08T00:00:00
6:26
ISS based EVA. Reconfigured SO, S1 and P1 cables for future trusses. Inspected P1 NTA. Released S1 CETA light stanchion w/Russian hammer and installed one light. Installed Lab HX spool positioning devices (SPD’s). Rerouted cables for redundant power to CMG #2. Reinstalled S1 radiator beam valve module (RBVM) thermal...
386
340
Russia
Alexander Kaleri Mike Foale
ISS Incr-8
2004-02-26T00:00:00
3:55
Replaced an SKK removable materials sample cassette from DC-1. Retrieved Japanese MPAC/SEEDS panel #2 and relocated MPAC/SEEDS panel #3. Installed ESA "Matryoshka" experiment. Removed two Velcro straps from the SM's WA2 ham radio antenna. Replaced two SKK removable materials sample cassettes on SM. Suit cooling system ...
235
341
Russia
Gennady Padalka Mike Fincke
ISS Incr-9
2004-06-24T00:00:00
0:14
Fincke's Orlan O2 injector lever not in fully closed position. EVA attempt terminated early.
14
342
Russia
Gennady Padalka Mike Fincke
ISS Incr-9
2004-06-30T00:00:00
5:39
Replaced RPCM on SO truss for CMG #2 after extending and translating along Strela crane. Completed getahead tasks on DC1 (contamination sensor, fabric handrails, 2 handrail end stops)
339
343
Russia
Gennady Padalka Mike Fincke
ISS Incr-9
2004-08-03T00:00:00
4:30
Installed 2 ATV antennas. Removed 6 ATV laser reflectors and installed 3 new reflectors. Demated cable from failed ATV camera. Replaced several experiments (Kromka thruster contam, CKK material exposure, Platan-M cosmic rays). Installed 2 handrail end stops on DC1 aft hatch
270
344
Russia
Gennady Padalka Mike Fincke
ISS Incr-9
2004-09-03T00:00:00
5:21
Replaced FGB thermal system fluid control unit. Installed 4 safety tether fairleads on FGB. Stopped motion to aid test for phantom torque upon CMGs. Installed 3 ATV antennas on SM and removed 5 antenna covers. Installed 3 of 4 handrail end stops on DC1 fwd hatch. Photographed MPAC/SEEDS experiment. Jettisoned antenna c...
321
345
Russia
Leroy Chiao Salizhan Sharipov
ISS Incr-10
2005-01-26T00:00:00
5:28
Installed science workstation and German Rokviss robotic experiment on SM. Transfered MPAC/SEEDs experiment panel to new location on same stand. Installed Rokviss antenna on MPAC/SEEDs mounting structure (cable reconnection due to initial mating error). Photoed contamination on vent valves of Elektron, Vozdukh and trac...
328
346
Russia
Leroy Chiao Salizhan Sharipov
ISS Incr-10
2005-03-28T00:00:00
4:30
Installed 3 ATV antennas on SM fwd end. Jettisoned German Nanosputnik experiment. Installed ATV GPS antenna on SM aft end. Photographed/observed ONA antenna drive to aid MCC-M troubleshooting. Inpected ATV retroreflector for contamination (little found). Jettisoned elec caps, antenna covers, glove wipe towels
270
138
USA
Soichi Noguchi Steve Robinson
STS-114/LF1
2005-07-30T00:00:00
6:50
Shuttle based EVA. Demonstrated repairs of Shuttle thermal protection (tile emittance wash and NOAX on RCC cracks). Installed External Stowage Platform Attachment Device (ESPAD) outside ISS airlock. Replaced GPS antenna and retrieved 2 MISSE experiments. Photographed damaged thermal blanket under Orbiter window
410
139
USA
Soichi Noguchi Steve Robinson
STS-114/LF1
2005-08-01T00:00:00
7:14
Shuttle based EVA. Replaced ISS CMG#1. Stowed old CMG in PLB . Retrieved/relocated tools for next EVA (handle for ISS thermal radiator rotary joint motor controller, forceps for tile gap filler removal, a foot restraint from ISS robotic arm)
434
140
USA
Soichi Noguchi Steve Robinson
STS-114/LF1
2005-08-03T00:00:00
6:01
Shuttle based EVA. Attached External Stowage Platform (ESP2) to ISS, removed/returned ESP2's grapple fixture, installed ISS solar cell exposure experiment MISSE 5, opened/closed sample lid to enable robotic survey of thermal protection samples and removed two Shuttle tile gap fillers. Inspected/photographed solar beta ...
361
347
Russia
Sergei Krikalev John Phillips
ISS Incr-11
2005-08-18T00:00:00
4:58
Retrieve canister #1 of the Biorisk experiment can #1, MPAC/SEEDS materials experiment panel #3 and Matryoshka radiation dosimetry experiment. Install Automated Transfer Vehicle (ATV) backup docking camera. Relocate SKK material experiment #4 and install #5. Ran out of time to relocate Russian cargo crane grapple fixtu...
298
141
USA
Bill McArthur Valeri Tokarev
Incr-12
2005-11-07T00:00:00
5:22
ISS based EVA. Egress delayed by 1 hr due to overlooked valve. Installed P1 TV camera, removed S1 thermal rotary joint motor controller, jettisoned P6 floating potential probe and replaced RPCM of mobile transporter. Relocated safety tethers and foot restraint as prep for future work. Camera lens bumper lost overboard....
322
348
Russia
Valeri Tokarev Bill McArthur
ISS Incr-12
2006-02-03T00:00:00
5:44
Jettisoned life expired Orlan suit with Ham radio inside (RadioSkaf or Suit Sat). Relocated Strela adapter from FGB to PMA-3. Removed zenith TUS cable from IUA, secured to MT handrail because safing bolt would not engage adequately. Retrieved science experiment (Biorisk) and photographed exterior of Service Module.
344
142
USA
Piers Sellers Mike Fossum
STS-121 / ULF1.1
2006-07-08T00:00:00
7:31
ISS based EVA. Installed cable cutter blade blocker on mobile transporter zenith interface umbilical assembly (IUA). Demonstrated use of RMS and boom as EV crew work platform for Shuttle thermal protection repairs
451
143
USA
Piers Sellers Mike Fossum
STS-121 / ULF1.1
2006-07-10T00:00:00
6:47
ISS based EVA. Replaced the mobile transporter's nadir IUA and trailing umbilical cable reel. Stowed thermal system spare pump on ISS airlock pallet. SAFER latches found unsecured
407
144
USA
Piers Sellers Mike Fossum
STS-121 / ULF1.1
2006-07-12T00:00:00
7:11
ISS based EVA. Tested NOAX repairs on samples of Shuttle RCC thermal protection. Tested infrared camera on ISS radiators and Shuttle RCC. Installed grapple fixture on S1 truss ammonia tank. RCC repair spatula lost overboard.
431
145
USA
Jeff Williams Thomas Reiter
Incr-13
2006-08-03T00:00:00
5:54
ISS based EVA. Installed floating point measurement unit on S1. Installed MISSE 3 &4 on airlock. Installed RJMC and replaced radiator MDM on S1. Installed S0 radiator line shunt jumpers (2) and fluid disconnect spool positioning devices (3). Tested infrared camera on RCC samples. Installed CETA light on S1 (connector c...
354
146
USA
Joe Tanner Heide Stefanyshyn-Piper
STS-115/12A
2006-09-12T00:00:00
6:26
ISS based EVA. Connected the P1/P3 lower and upper tray umbilicals. Released solar array launch restraints and positioned the stowed arrays for automated deployment. Rotated P4 truss keel pin to stowed position. Removed of 2 of 16 solar array joint launch locks, deployed all 4 solar array joint braces and removed 2 avi...
386
147
USA
Dan Burbank Steve MacLean
STS-115/12A
2006-09-13T00:00:00
7:11
ISS based EVA. Removed solar array alpha joint launch locks and restraints. Lost a bolt from a launch lock cover. Release of one launch restraint bolt required a wrench cheater bar and both crew for leverage. Cleared items to permit P3 truss access by the ISS mobile transporter for future assembly work. Secured the vel...
431
148
USA
Joe Tanner Heide Stefanyshyn-Piper
STS-115/12A
2006-09-15T00:00:00
6:42
ISS based EVA. Retrieved MISSE-5 experiment. Installed bolt retainers on the P6 beta gimbal struts. Unable to engage hinge lock on P6 beta gimbal strut. Freed snagged tether from mobile transporter. Release P4 radiator launch restraints. Set up two foot restraints for 12A.1. Released bolt torques of P4 MMOD cover. Repl...
402
350
Russia
Mikhail Tyurin Michael Lopez-Alegria
ISS Incr-14
2006-11-22T00:00:00
5:38
Performed golf demo (one ball jettisoned). Inspected but unable to stow Progress antenna. Relocated ATV antenna impairing SM reboost engine. Installed solar radiation experiment (minus data cable)
338
149
USA
Robert Curbeam Christer Fuglesang
STS-116/12A.1
2006-12-12T00:00:00
6:36
ISS based EVA. Removed launch locks from the P5 truss. Aided alignment and secured the P5 truss to the P4 truss. Relocated a radiator grapple fixture. Replaced a failed camera on the S1 truss (13A prep). Performed 13A assembly get-ahead tasks (P5 electrical connections, latch opening, 2 of 4 outboard launch locks). Los...
396
150
USA
Robert Curbeam Christer Fuglesang
STS-116/12A.1
2006-12-14T00:00:00
5:00
ISS based EVA. Reconfigured electrical cables of power channels 2 and 3 and Z1 patch panel. Relocated both CETA carts (13A prep). Installed insulation on the force moment sensors of ISS robotic arm. Installed 4 bags containing fluid line and pump module servicing equipment.
300
151
USA
Robert Curbeam Sunita Williams
STS-116/12A.1
2006-12-16T00:00:00
7:31
ISS based EVA. Reconfigured electrical cables of power channels 1 and 4, Z1 patch panel and Russian power. Transfered Service Module MMOD protection panels to PMA3. Installed the grapple fixture on spare flex hose rotary coupler. Manually aided retraction of the P6 port solar array-completion deferred to next EVA. Lost...
451
152
USA
Robert Curbeam Christer Fuglesang
STS-116/12A.1
2006-12-18T00:00:00
6:38
ISS based EVA. Manually aided full retract of P6 port solar array. Inspected P6 stbd solar array. Adjusted new insulation of SSRMS force sensors
398
153
USA
Mike Lopez-Alegria Sunita Williams
Incr-14
2007-01-31T00:00:00
7:55
ISS based EVA. Established permanent configuration of the electrical and fluid lines of the loop A thermal system. Secured and covered the stowed P6 stbd radiator. Relocated 1 of 2 ammonia servicer jumpers. NH3 leakage induced bakeout and contamination sensing. Installed ISS to Shuttle power transfer cables between Lab...
475
154
USA
Mike Lopez-Alegria Sunita Williams
Incr-14
2007-02-04T00:00:00
7:11
ISS based EVA. Established permanent configuration of the electrical and fluid lines of the loop B thermal system. NH3 leakage induced bakeout and contamination sensing. Relocated ammonia servicer jumper. Secured the stowed P6 aft radiator. Retrieved an MDM thermal shade. Installed ISS to Shuttle power transfer cables ...
431
155
USA
Mike Lopez-Alegria Sunita Williams
Incr-14
2007-02-08T00:00:00
6:40
ISS based EVA. Removed and jettisoned 4 thermal shrouds. Deployed P3 cargo attachment site Removed last 2 launch locks from the P5 truss. Finished installation of ISS to Shuttle power transfer cables and reinstalled an in-cabin reconfigured foot restraint. Photoed PMA2 docked audio connector.
400
351
Russia
Mikhail Tyurin Michael Lopez-Alegria
ISS Incr-14
2007-02-22T00:00:00
6:18
Cut/cleared Progress antenna interfering with undocking. Adjusted ATV antenna interfaces. Replaced a materials experiment. Installed data cable of radiation experiment. Photographed ATV reflectors and numerous experiments. Installed 2 foot restraints outside airlock. Inspected safety of cargo crane mechanisms. Successf...
378
352
Russia
Fyodor Yurchikhin Oleg Kotov
ISS Incr-15
2007-05-30T00:00:00
5:25
Start delayed 45 minutes due to comm misconfig. Transferred MMOD panels from PMA3 to SM and installed 5 of 17 panels. Installed ATV GPS antenna cable. Suit wrist mirror lost overboard.
325
353
Russia
Fyodor Yurchikhin Oleg Kotov
ISS Incr-15
2007-06-06T00:00:00
5:37
Installed SM-FGB cable for local area network (LAN) and Biorisk science experiment. Installed last 12 MMOD shields on SM.
337
156
USA
Jim Reilly Danny Olivas
STS-117/13A
2007-06-11T00:00:00
6:15
ISS based EVA. Connected electrical lines btw S1 and S3/S4 trusses. Unstowed solar array blanket boxes and beta gimbals. Stowed the S3/S4 keel. Removed and jettisoned thermal shrouds from 5 avionics boxes. Released restraints for S4 radiator deployment. Engaged drive lock, removed 6 launch locks and rigidized struts of...
375
157
USA
Pat Forrester Steve Swanson
STS-117/13A
2007-06-13T00:00:00
7:16
ISS based EVA. Aided retraction of enough bays of P6 solar array to permit alpha joint rotation. Removed 10 of 16 launch locks, deloyed braces and engaged drive lock of S3 solar array alpha joint
436
158
USA
Danny Olivas Jim Reilly
STS-117/13A
2007-06-15T00:00:00
7:58
ISS based EVA. Replaced vent valve on Lab for US O2 generator. Secured loose thermal blanket on Shuttle OMS pod. Finished retracting P6 solar array
478
159
USA
Pat Forrester Steve Swanson
STS-117/13A
2007-06-17T00:00:00
6:29
ISS based EVA. Opened H2 vent for new US O2 generator. Installed video camera stand. Verified drive lock config and removed 6 launch restraints of the S3 solar array alpha joint. Stowed S3 drag link and keel pin. Released S4 MMOD shield bolts. Cleared MT path. Installed FGB-Node1 local area network cable, but had to su...
389
160
USA
Clay Anderson Fyodor Yurchikhin
Incr-15
2007-07-23T00:00:00
7:41
ISS based EVA. Installed a video camera stand and jettisoned its stowage restraints. Replaced a failed RPCM to restore mobile transporter power redundancy. Jettisoned the early ammonia servicer. Cleaned the Node1 berthing mechanism seal. Relocated the P6 aux bag to Z1, removed failed GPS antenna #4 and released Node 2 ...
461
161
USA
Rick Mastracchio Dave Williams
STS-118/13A.1
2007-08-11T00:00:00
6:17
ISS based EVA. Installed the S5 truss and connected S4-S5 electrical lines. Relocated the radiator grapple fixture on S5. Removed S5-S6 launch locks on S5 and opened the S5-S6 capture latch. Secured the auto retracted P6 radiator.
377
162
USA
Rick Mastracchio Dave Williams
STS-118/13A.1
2007-08-13T00:00:00
6:28
ISS based EVA. Replaced failed CMG 3 and stowed failed unit on pallet outside ISS airlock for return on future Shuttle mission. Photographed MISSE 3 & 4 experiments.
388
163
USA
Rick Mastracchio Clay Anderson
STS-118/13A.1
2007-08-15T00:00:00
5:28
ISS based EVA. Relocated the S-band antenna from P6 to P1 and installed new signal processor and transponder on P1. Retrieved P6 transponder. Relocated CETA carts. Damaged glove terminated EVA early.
328
164
USA
Dave Williams Clay Anderson
STS-118/13A.1
2007-08-18T00:00:00
5:02
ISS based EVA. Installed the Orbiter inspection boom restraints on S1. Engaged S-band antenna gimbal locks on Z1. Retrieved MISSE 3&4 experiments. Installed antennas for external wireless sensors on Lab
302
165
USA
Scott Parazynski Doug Wheelock
STS-120/10A
2007-10-26T00:00:00
6:14
ISS based EVA. Stowed old S-band antenna in Shuttle for return. Released launch power cable from Node 2 and temp secured grapple fixture on Node 2. Resecured Node 2 window cover that opened during launch. Demated Z1-P6 fluid lines and covered stowed radiator and avionics box on P6. Did post EVA ammonia cleanup for mino...
374
166
USA
Scott Parazynski Dan Tani
STS-120/10A
2007-10-28T00:00:00
6:33
ISS based EVA. Demated Z1 to P6 umbilicals and attachment bolts. Installed Node 2 EVA aids (handrails, foot restraint sockets, slidewire). Removed all Node 2 berthing mechanism pins, but lost one pin within cover. Confirmed handrail on CETA cart not source of glove damage. Inspected starboard solar array alpha joint an...
393
167
USA
Scott Parazynski Doug Wheelock
STS-120/10A
2007-10-30T00:00:00
7:08
ISS based EVA. Connected 4 bolts and 4 cables to mate P6 to P5. Inspected port solar array alpha joint and found no issues. Removed solar array avionics thermal shroud. Released P6 radiator restraints to permit deployment. Reconfigured P1 radiator cabling for deploy. Relocated spare MBSU to ISS. Retrieved N2 vent tool,...
428
168
USA
Scott Parazynski Doug Wheelock
STS-120/10A
2007-11-03T00:00:00
7:19
ISS based EVA. Inspected and repaired damaged P6 solar array and supported full deployment. Installed 5 "cuff links" as reinforcements for separated panel hinges. Cut frayed snagged hinge and guide wires. Retrieved 2 foot restraints with suspect sharp edges for IVA inspect/correct. Retrieved camera left out by prior EV...
439
169
USA
Peggy Whitson Yuri Malenchenko
Incr-16
2007-11-09T00:00:00
6:55
ISS based EVA. Prepared PMA2 for relocation to Node 2. Demated electrical cables, removed light on Lab and removed thermal cover from Node 2 fwd port. Connected power/data cables for Node 2 grapple fixture. Connected power cable for service module power. Replaced failed RPCM. Reconfigured FGB-PMA1 jumpers. Retrieved S-...
415
170
USA
Peggy Whitson Dan Tani
Incr-16
2007-11-20T00:00:00
7:16
ISS based EVA. Installed stbd thermal cooling lines on Node 2. Connected elec cables to PMA2. Lost wiretie overboard and EV2 biomed signal failed
436
171
USA
Peggy Whitson Dan Tani
Incr-16
2007-11-24T00:00:00
7:04
ISS based EVA. Installed port thermal cooling lines on Node 2. Connected elec cables to PMA2. Inspected and photoed stbd solar array joint
424
172
USA
Peggy Whitson Dan Tani
Incr-16
2007-12-18T00:00:00
6:56
ISS based EVA. Inspected stbd solar array alpha and beta joints. No obvious causes found for rotation issues. Retrieved 1 trundle bearing from alpha joint for in-cabin and ground assessments.
416
173
USA
Peggy Whitson Dan Tani
Incr-16
2008-01-30T00:00:00
7:10
ISS based EVA. Replaced failed solar array beta gimbal unit and inspected alpha joint
430
174
USA
Rex Walheim Stan Love
STS-122/1E
2008-02-11T00:00:00
7:58
ISS based EVA. Enabled Columbus installation (demated STS heater cables, installed grapple fixture, removed window & berthing mech covers) and began prep of nitrogen tank transfer by loosening bolts. Accidently found possible source of cut gloves on airlock handrail (MMOD impact)
478
175
USA
Rex Walheim Hans Schlegel
STS-122/1E
2008-02-13T00:00:00
6:45
ISS based EVA. Replaced nitrogen tank on P1 truss and installed old tank on Shuttle for earth return. Installed trunnion covers on Columbus
405
176
USA
Rex Walheim Stan Love
STS-122/1E
2008-02-15T00:00:00
7:25
ISS based EVA. Installed 2 ESA science experiments, 9 handrails, 2 foot restraint sockets and keel pin cover on Columbus. Transfered failed CMG for Shuttle return. Photographed sharp edge on airlock handrail
445
181
USA
Robert Behnken Mike Foreman
STS-123/1JA
2008-03-22T00:00:00
6:02
ISS based EVA. Stowed Shuttle inspection boom on ISS S1 truss with keep alive power. Installed trundle bearing on stbd solar array alpha joint and completed inspections under joint covers. Installed MISSE experiments on pallet outside Columbus (1 reqd light hammering of pip pins). Trunnion covers installed on Japanese ...
362
182
USA
Mike Fossum Ron Garan
STS-124/1J
2008-06-03T00:00:00
6:48
ISS based EVA. Released special launch restraint of elbow camera of Shuttle robotic arm. Demated Shuttle inspection boom from ISS truss to permit return/use. Prepared Japanese module for install by demating cables from Shuttle, removing berthing mech covers and releasing window locks. Worked on damaged solar array join...
408
183
USA
Mike Fossum Ron Garan
STS-124/1J
2008-06-05T00:00:00
7:11
ISS based EVA. Installed 2 cameras for JEM robot arm op. Removed thermal covers from JEM arm. Prepped JEM berthing mech for stowage module relocation (remove cover, release launch restraints, eliminate insulation interference). Installed JEM trunnion and keep pin covers. Prepped for N2 tank replacement. Retrieved faile...
431
184
USA
Mike Fossum Ron Garan
STS-124/1J
2008-06-08T00:00:00
6:33
ISS based EVA. Replaced N2 tank on S1 truss. Reinstalled repaired truss camera. Finished JEM interfaces (window launch locks, berthing mech MMOD shields, robotic arm insulation/launch lock). Sampled port solar array joint contamination. Removed stbd solar array joint launch restraint
393
354
Russia
Sergei Volkov Oleg Kononenko
ISS Incr-17
2008-07-10T00:00:00
6:19
Removed a pyrobolt from 1 of 5 Soyuz capsule restraints. First use of US helmet TV on Orlan. Lost tool and insulation fragments overboard. Jettisoned thruster cover bounced off radiator in wrong direction.
379
355
Russia
Sergei Volkov Oleg Kononenko
ISS Incr-17
2008-07-15T00:00:00
5:54
Prepped for new module (MRM2) installation by installing a SM docking target and inspecting antenna attach points. Installed Vsplesk cosmic radiation experiment and retrieved Biorisk experiment. Unbent a ham radio antenna.
354
185
USA
Heide Stefanyshyn-Piper Steve Bowen
STS-126/ULF2
2008-11-18T00:00:00
6:52
ISS based EVA. Empty N2 tank transferred to Shuttle. Spare flex hose rotary coupler relocated to ISS. Thermal covers removed from JEM ext facility berthing mechanism. Initiated cleaning and lube of stbd SARJ. 2 stbd SARJ trundle bearings replaced and 1 removed. Lost bag of SARJ cleaning/lube tools overboard. As bonus, ...
412
186
USA
Heide Stefanyshyn-Piper Shane Kimbrough
STS-126/ULF2
2008-11-20T00:00:00
6:45
ISS based EVA. Relocated both CETA carts from stbd to port truss to prep for S6 truss assy on next STS flt. Continued replacement of cleaning/lube of stbd solar array joint and replacement of trundle bearings. Overtightened one new trundle bearing and had to use spare. Lubed end effector snares of ISS robotic arm. Reco...
405
187
USA
Heide Stefanyshyn-Piper Steve Bowen
STS-126/ULF2
2008-11-22T00:00:00
6:57
ISS based EVA. Replaced all of the remaining stbd trundle bearings except one. Cleaned and lubed stbd race ring.
417
188
USA
Steve Bowen Shane Kimbrough
STS-126/ULF2
2008-11-24T00:00:00
6:07
ISS based EVA. Lubricated port SARJ race ring. Replaced last trundle bearing on stbd SARJ. Retracted failed latch of JEM ext facility berth mech and installed covers. For HTV, installed 1 of 2 GPS antennas on JEM logistics module for HTV and a camera on P1 truss. Tasks ended early due to higher than expected work rate ...
367
357
Russia
Yuri Lonchakov Mike Fincke
ISS Incr-18
2009-03-10T00:00:00
4:48
Cut off excess length of fabric straps near DC1 antennas and docking target. Reinstalled EXPOSE-R experiment and adjusted orientation of SKK experiment panel. Closed thermal insulation flap over electrical connector panel. Photographed external hardware
288
189
USA
Steve Swanson Richard Arnold
STS-119/15A
2009-03-19T00:00:00
6:07
ISS based EVA. Bolted S6 to S5 truss and mated electrical cables. Stowed X6 keel pin, deployed solar array linkages (1 of 4 latches did not engage), removed/jettisoned avionics thermal covers, released radiator restraints and removed blanket box restraints. Deployed S6 avionics MMOD shield
367
190
USA
Steve Swanson Joseph Acaba
STS-119/15A
2009-03-21T00:00:00
6:30
ISS based EVA. Loosened restraints of P6 batteries for future replacement. Unable to fully deploy P3 interface for future ORU spares (adj diameter pin suspect). Due to time, deferred S3 payload attach sys deploy. Due to elec conn demate failure, deferred Z1 patch panel reconfig for CMG pwr. Installed JEM GPS antenna. T...
390
191
USA
Richard Arnold Joseph Acaba
STS-119/15A
2009-03-23T00:00:00
6:27
ISS based EVA. Relocated one CETA cart from port to stbd side of mobile transporter. Again unable to finish deploy of P3 spares attach sys. Again deferred S3 payload attach deploy and Z1 patch panel reconfig. Lubed robotic arm end effector snares, replaced CETA cart coupler, reconfigured elec conns of truss attach bolt...
387
192
USA
John Grunsfeld Andrew Feustel
STS-125/HST 4
2009-05-14T00:00:00
7:20
HST servicing. Replaced wide field camera (after high torque time consuming bolt release) and science computer. Installed soft capture mechanism for future automated disposal mission. Installed 2 of 3 bolt/latch mechanisms on large doors (after difficulties with alignments).
440
193
USA
Mike Massimino Mike Good
STS-125/HST 4
2009-05-15T00:00:00
7:56
HST servicing. Replaced 3 of 3 gyro packages and 1st group of 3 batteries. Tolerance issue forced installation of 1 non-optimum but adequate spare gyro. Difficulty closing doors to gyro bay.
476
194
USA
John Grunsfeld Andrew Feustel
STS-125/HST 4
2009-05-16T00:00:00
6:36
HST servicing. Replaced COSTAR with cosmic origins spectrograph (COS). Repaired failed advanced camera for surveys (ACS) with removal of 4 detector circuit boards and installation of new power supply and new detector circuit boards
396
195
USA
Mike Massimino Mike Good
STS-125/HST 4
2009-05-17T00:00:00
8:02
HST servicing. Repaired failed space telescope imaging spectrograph (STIS) with new power supply board. Time lost to stuck handrail bolt and failed power tool battery. Ran out of time to install new outer blanket (NOBL) #8.
482
196
USA
John Grunsfeld Andrew Feustel
STS-125/HST 4
2009-05-18T00:00:00
7:02
HST servicing. Installed 2nd/last group of batteries. Replaced fine guidance sensor (FGS). Installed NOBLs 8, 5 and 7 (lots of loose debris with 2nd). Reinstalled low gain antenna cover to permanently protect exposed antenna parts after tip accidently broken off during equipment cleanup
422
358
Russia
Gennady Padalka Mike Barratt
ISS Incr-19
2009-06-05T00:00:00
4:54
First use of new Orlan MK suits with digital caution/warning electronics. Started 1 hour late due to faulty CO2 readings. Installed two docking navigation antennas on zenith port of service module as prep for MRM2 arrival
294
359
Russia
Gennady Padalka Mike Barratt
ISS Incr-19
2009-06-10T00:00:00
0:12
Relocated docking cone to zenith port of Service Module as prep for MRM2 arrival
12
197
USA
Dave Wolf Tim Kopra
STS-127/2JA
2009-07-18T00:00:00
5:32
ISS based EVA. Aided JEM exposed facility install by jettisoning berthing mech covers and removing launch heater cable. Aided spares pallet transfer by removing launch heater cable. Removed JEM robot arm ground tab. Opened Node 1 & 2 berthing camera blankets as prep for PMA3 relocate and HTV arrival. Reconfig port CETA...
332
198
USA
Dave Wolf Tom Marshburn
STS-127/2JA
2009-07-20T00:00:00
6:52
ISS based EVA. Transfered 3 large spares to ISS. Installed grapple bar on P1 ammonia tank as prep for future replace. Installed 2 of 6 ground connector sleeves for Shuttle to ISS power transfer sys. Comm cap perf poor due to sweat
412
199
USA
Dave Wolf Chris Cassidy
STS-127/2JA
2009-07-22T00:00:00
5:59
ISS based EVA. Relocated foot restraint socket for HTV arrival prep. Prepped 3 payloads for robotic install outside JEM. Installed 2 of 6 ground connector sleeves for Shuttle to ISS power transfer sys. Replaced 2 batteries on P6 truss and stowed 2 old batts in Shuttle for return. Stopped early due to suit CO2 increase ...
359
200
USA
Chris Cassidy Tom Marshburn
STS-127/2JA
2009-07-24T00:00:00
7:12
ISS based EVA. Replaced 4 batteries on P6 truss and stowed old batts in Shuttle for return.
432
201
USA
Chris Cassidy Tom Marshburn
STS-127/2JA
2009-07-27T00:00:00
4:54
ISS based EVA. Adjusted SPDM thermal covers. Reconfiged elec connectors of Z1 patch panel to restore CMG pwr redundancy. Installed two JEM external facility video cameras. Installed JEM handrail, foot restraint socket and gap spanner. Relocated a foot restraint. Due to high use dry out of CO2 can, lacked time to deploy...
294
202
USA
Danny Olivas Nicole Stott
STS-128/17A
2009-09-01T00:00:00
6:35
ISS based EVA. Removed NH3 tank from P1 and temp stowed. Transferred MISSE 6a/b & EuTEF experiments to Shuttle
395
203
USA
Danny Olivas Christer Fugelsang
STS-128/17A
2009-09-03T00:00:00
6:39
ISS based EVA. Start delayed to redo prebreathe after comm cap readjust. Installed new NH3 tank on P1 and stowed old tank on Shuttle. Installed grapple bar on S1 NH3 tank. Unable to connect PMA3 heater cables due to prior incorrect clocking of PMA3. Installed camera lens covers on station arm as prep for HTV. Relocated...
399
204
USA
Danny Olivas Christer Fugelsang
STS-128/17A
2009-09-05T00:00:00
7:01
ISS based EVA. Deployed S3 zenith pallet. Replaced failed rate gyro #2 and RPCM on S0. Installed 2 GPS antennas. Removed Node1 slidewire as prep for Node3. Installed two S0-Node3 cables (one connector unable to mate). Helmet TV camera/lights almost lost overboard due to bumped latches
421
205
USA
Mike Foreman Robert Satcher
STS-129/ULF3
2009-11-19T00:00:00
6:37
ISS based EVA. Installed spare Sband antenna and cables for spare Kuband antenna. Prepped for Node3 install (replace handrail w/ NH3 line bracket). Lubricated end effectors of mobile transporter payload base and JEM robot arm. Installed FGB-Node1 network cable. Deployed S3 payload attach structure
397
206
USA
Mike Foreman Randy Bresnick
STS-129/ULF3
2009-11-21T00:00:00
6:08
ISS based EVA. Installed ham radio antennas on Columbus. Relocated floating potential measure unit from S1 to P1. Deployed the last two payload attach structures and installed wireless video transcvr (all on S3). Retrieved foot restraint for cabin reconfig and relocated tool stanchion. Photographed suspect seals on Nod...
368
207
USA
Robert Satcher Randy Bresnick
STS-129/ULF3
2009-11-23T00:00:00
5:42
ISS based EVA. Start delayed by detached drink bag valve. Relocated some airlock MMOD shields and installed O2 tank outside US airlock. Installed MISSE experiments 7A & 7B on external logistics carrier. Released bolt on NH3 tank. Installed thermal covers on mobile base and two fluid jumpers. Relocated a foot restraint
342
360
Russia
Oleg Kotov Maxim Suraev
ISS Incr-22
2010-01-14T00:00:00
5:44
Prepped new module (MRM2) for Soyuz/Progress usage by installing Kurs navigation antennas/cables and docking targets. Installed 2 hatch handrails, jettisoned excess thermal blankets and retrieved can of Biorisk experiment
344
211
USA
Rick Mastracchio Clayton Anderson
STS-131/19A
2010-04-09T00:00:00
6:28
ISS based EVA. Temp stowed new NH3 tank on ISS robot arm. Retrieved JAXAA's MPAC/SEED experiment for return. Replaced rate gyro assembly #1. Relocated a foot restraint socket extender. Removed P1 flex hose rotary coupler launch restraint bolts and released cable clamps. Tightened grapple fixture attachment bolts of old...
388
212
USA
Rick Mastracchio Clayton Anderson
STS-131/19A
2010-04-11T00:00:00
7:26
ISS based EVA. Removed old NH3 tank and temp stowed on CETA cart. Overcame a troublesome bolt and installed new NH3 tank/cables. Installed 2 radiator grapple beams and relocated a foot restraint
446