eva_number int64 1 371 ⌀ | country stringclasses 2
values | crew stringlengths 8 40 | vehicle stringlengths 5 31 ⌀ | date timestamp[ns]date 1965-06-03 00:00:00 2013-08-22 00:00:00 ⌀ | duration stringlengths 4 4 ⌀ | purpose stringlengths 24 652 ⌀ | duration_minutes float64 0 536 ⌀ |
|---|---|---|---|---|---|---|---|
127 | USA | F. Chang-Diaz Philippe Perrin | STS-111/UF2 | 2002-06-09T00:00:00 | 7:14 | ISS based EVA. PDGF installed on P6. SM MMOD panels stowed on PMA1. MBS blankets removed as prep for MBS install onto MT. | 434 |
128 | USA | F. Chang-Diaz Philippe Perrin | STS-111/UF2 | 2002-06-11T00:00:00 | 5:00 | ISS based EVA. MT-MBS cables connected and MT-MBS bolts mated. POA deployed. Zenith TUS safing bolt. MBS camera relocated. | 300 |
129 | USA | F. Chang-Diaz Philippe Perrin | STS-111/UF2 | 2002-06-13T00:00:00 | 7:16 | ISS based EVA. SSRMS wrist joint replaced. Failed joint stowed on Shuttle. | 436 |
338 | Russia | Valery Korzun Peggy Whitson | ISS Incr-5 | 2002-08-16T00:00:00 | 4:25 | EVA delayed 1:43 due to missed opening of primary O2 bottles in both suits. Removed 6 MMOD shield panels from PMA-1 and installed them on SM. Deferred EVA tasks for swab of fuel/oxidizer residue and installation of Kromka experiment. | 265 |
339 | Russia | Valery Korzun Sergei Treschev | ISS Incr-5 | 2002-08-26T00:00:00 | 5:21 | Installed ORU attachment frame outside FGB to house components for EVA assembly tasks. Retrieved and replaced panel #1 of Japan's MPAC/SEEDs materials experiments outside SM. Installed 4 fairleads on FGB for future routing of tethers. Added two ham radio antennas on SM (WA1 & WA2). Replaced the earlier deferred Kromka ... | 321 |
130 | USA | Dave Wolf Piers Sellers | STS-112/9A | 2002-10-10T00:00:00 | 7:01 | ISS based EVA. S1-S0 cables and fluid lines connected. S-band antenna deployed. S1 radiator restraints released. CETA cart launch locks released. S1 camera installed. | 421 |
131 | USA | Dave Wolf Piers Sellers | STS-112/9A | 2002-10-12T00:00:00 | 6:04 | ISS based EVA. Lab camera installed. S1 radiator restraints released. S1-S0 cables and fluid lines connected. SPD installed at Z1-P6. CETA cart launch locks released. NH3 tank cables attached. | 364 |
132 | USA | Dave Wolf Piers Sellers | STS-112/9A | 2002-10-14T00:00:00 | 6:36 | ISS based EVA. MT IUA replaced. S0-S1 NH3 jumpers connected. S1-S0 cables and fluid lines connected. S1 drag link stowed. SPD's installed on NH3 lines. | 396 |
133 | USA | Mike Lopez-Alegria John Herrington | STS-113/11A | 2002-11-26T00:00:00 | 6:45 | ISS based EVA. P1-S0 cables connected. CETA cart launch locks released. P1 drag link stowed. Spool positioning devices (SPD) installed. Wireless external transceiver assy (WETA) installed on Node 1 for EVA helmet video. | 405 |
134 | USA | Mike Lopez-Alegria John Herrington | STS-113/11A | 2002-11-28T00:00:00 | 6:10 | ISS based EVA. P1-S0 fluid lines connected. P1 keels stowed. Wireless external transceiver assy (WETA) installed on P1. CETA cart relocated from P1 to S1. | 370 |
135 | USA | Mike Lopez-Alegria John Herrington | STS-113/11A | 2002-11-30T00:00:00 | 7:00 | ISS based EVA. SPD's installed. MBSU cables reconfigured. NH3 tank lines attached. UHF antenna deployed (MT ran into stowed UHF antenna resulting in early deploy). SO DDCU cover installed. | 420 |
136 | USA | Ken Bowersox Don Pettit | Incr-6 | 2003-01-15T00:00:00 | 6:51 | ISS based EVA. Removed debris from Node nadir CBM. Released P1 truss radiator launch locks (10) to allow deploy. Failed to install CETA light on S1 (jammed in launch bracket). Measured the Early Ammonia Servicer (EAS) reservoir. Retrieved tools from Z1 and airlock tool boxes for future. Cut away thermal cover strap tha... | 411 |
137 | USA | Ken Bowersox Don Pettit | Incr-6 | 2003-04-08T00:00:00 | 6:26 | ISS based EVA. Reconfigured SO, S1 and P1 cables for future trusses. Inspected P1 NTA. Released S1 CETA light stanchion w/Russian hammer and installed one light. Installed Lab HX spool positioning devices (SPDÃÂs). Rerouted cables for redundant power to CMG #2. Reinstalled S1 radiator beam valve module (RBVM) thermal... | 386 |
340 | Russia | Alexander Kaleri Mike Foale | ISS Incr-8 | 2004-02-26T00:00:00 | 3:55 | Replaced an SKK removable materials sample cassette from DC-1. Retrieved Japanese MPAC/SEEDS panel #2 and relocated MPAC/SEEDS panel #3. Installed ESA "Matryoshka" experiment. Removed two Velcro straps from the SM's WA2 ham radio antenna. Replaced two SKK removable materials sample cassettes on SM. Suit cooling system ... | 235 |
341 | Russia | Gennady Padalka Mike Fincke | ISS Incr-9 | 2004-06-24T00:00:00 | 0:14 | Fincke's Orlan O2 injector lever not in fully closed position. EVA attempt terminated early. | 14 |
342 | Russia | Gennady Padalka Mike Fincke | ISS Incr-9 | 2004-06-30T00:00:00 | 5:39 | Replaced RPCM on SO truss for CMG #2 after extending and translating along Strela crane. Completed getahead tasks on DC1 (contamination sensor, fabric handrails, 2 handrail end stops) | 339 |
343 | Russia | Gennady Padalka Mike Fincke | ISS Incr-9 | 2004-08-03T00:00:00 | 4:30 | Installed 2 ATV antennas. Removed 6 ATV laser reflectors and installed 3 new reflectors. Demated cable from failed ATV camera. Replaced several experiments (Kromka thruster contam, CKK material exposure, Platan-M cosmic rays). Installed 2 handrail end stops on DC1 aft hatch | 270 |
344 | Russia | Gennady Padalka Mike Fincke | ISS Incr-9 | 2004-09-03T00:00:00 | 5:21 | Replaced FGB thermal system fluid control unit. Installed 4 safety tether fairleads on FGB. Stopped motion to aid test for phantom torque upon CMGs. Installed 3 ATV antennas on SM and removed 5 antenna covers. Installed 3 of 4 handrail end stops on DC1 fwd hatch. Photographed MPAC/SEEDS experiment. Jettisoned antenna c... | 321 |
345 | Russia | Leroy Chiao Salizhan Sharipov | ISS Incr-10 | 2005-01-26T00:00:00 | 5:28 | Installed science workstation and German Rokviss robotic experiment on SM. Transfered MPAC/SEEDs experiment panel to new location on same stand. Installed Rokviss antenna on MPAC/SEEDs mounting structure (cable reconnection due to initial mating error). Photoed contamination on vent valves of Elektron, Vozdukh and trac... | 328 |
346 | Russia | Leroy Chiao Salizhan Sharipov | ISS Incr-10 | 2005-03-28T00:00:00 | 4:30 | Installed 3 ATV antennas on SM fwd end. Jettisoned German Nanosputnik experiment. Installed ATV GPS antenna on SM aft end. Photographed/observed ONA antenna drive to aid MCC-M troubleshooting. Inpected ATV retroreflector for contamination (little found). Jettisoned elec caps, antenna covers, glove wipe towels | 270 |
138 | USA | Soichi Noguchi Steve Robinson | STS-114/LF1 | 2005-07-30T00:00:00 | 6:50 | Shuttle based EVA. Demonstrated repairs of Shuttle thermal protection (tile emittance wash and NOAX on RCC cracks). Installed External Stowage Platform Attachment Device (ESPAD) outside ISS airlock. Replaced GPS antenna and retrieved 2 MISSE experiments. Photographed damaged thermal blanket under Orbiter window | 410 |
139 | USA | Soichi Noguchi Steve Robinson | STS-114/LF1 | 2005-08-01T00:00:00 | 7:14 | Shuttle based EVA. Replaced ISS CMG#1. Stowed old CMG in PLB . Retrieved/relocated tools for next EVA (handle for ISS thermal radiator rotary joint motor controller, forceps for tile gap filler removal, a foot restraint from ISS robotic arm) | 434 |
140 | USA | Soichi Noguchi Steve Robinson | STS-114/LF1 | 2005-08-03T00:00:00 | 6:01 | Shuttle based EVA. Attached External Stowage Platform (ESP2) to ISS, removed/returned ESP2's grapple fixture, installed ISS solar cell exposure experiment MISSE 5, opened/closed sample lid to enable robotic survey of thermal protection samples and removed two Shuttle tile gap fillers. Inspected/photographed solar beta ... | 361 |
347 | Russia | Sergei Krikalev John Phillips | ISS Incr-11 | 2005-08-18T00:00:00 | 4:58 | Retrieve canister #1 of the Biorisk experiment can #1, MPAC/SEEDS materials experiment panel #3 and Matryoshka radiation dosimetry experiment. Install Automated Transfer Vehicle (ATV) backup docking camera. Relocate SKK material experiment #4 and install #5. Ran out of time to relocate Russian cargo crane grapple fixtu... | 298 |
141 | USA | Bill McArthur Valeri Tokarev | Incr-12 | 2005-11-07T00:00:00 | 5:22 | ISS based EVA. Egress delayed by 1 hr due to overlooked valve. Installed P1 TV camera, removed S1 thermal rotary joint motor controller, jettisoned P6 floating potential probe and replaced RPCM of mobile transporter. Relocated safety tethers and foot restraint as prep for future work. Camera lens bumper lost overboard.... | 322 |
348 | Russia | Valeri Tokarev Bill McArthur | ISS Incr-12 | 2006-02-03T00:00:00 | 5:44 | Jettisoned life expired Orlan suit with Ham radio inside (RadioSkaf or Suit Sat). Relocated Strela adapter from FGB to PMA-3. Removed zenith TUS cable from IUA, secured to MT handrail because safing bolt would not engage adequately. Retrieved science experiment (Biorisk) and photographed exterior of Service Module. | 344 |
142 | USA | Piers Sellers Mike Fossum | STS-121 / ULF1.1 | 2006-07-08T00:00:00 | 7:31 | ISS based EVA. Installed cable cutter blade blocker on mobile transporter zenith interface umbilical assembly (IUA). Demonstrated use of RMS and boom as EV crew work platform for Shuttle thermal protection repairs | 451 |
143 | USA | Piers Sellers Mike Fossum | STS-121 / ULF1.1 | 2006-07-10T00:00:00 | 6:47 | ISS based EVA. Replaced the mobile transporter's nadir IUA and trailing umbilical cable reel. Stowed thermal system spare pump on ISS airlock pallet. SAFER latches found unsecured | 407 |
144 | USA | Piers Sellers Mike Fossum | STS-121 / ULF1.1 | 2006-07-12T00:00:00 | 7:11 | ISS based EVA. Tested NOAX repairs on samples of Shuttle RCC thermal protection. Tested infrared camera on ISS radiators and Shuttle RCC. Installed grapple fixture on S1 truss ammonia tank. RCC repair spatula lost overboard. | 431 |
145 | USA | Jeff Williams Thomas Reiter | Incr-13 | 2006-08-03T00:00:00 | 5:54 | ISS based EVA. Installed floating point measurement unit on S1. Installed MISSE 3 &4 on airlock. Installed RJMC and replaced radiator MDM on S1. Installed S0 radiator line shunt jumpers (2) and fluid disconnect spool positioning devices (3). Tested infrared camera on RCC samples. Installed CETA light on S1 (connector c... | 354 |
146 | USA | Joe Tanner Heide Stefanyshyn-Piper | STS-115/12A | 2006-09-12T00:00:00 | 6:26 | ISS based EVA. Connected the P1/P3 lower and upper tray umbilicals. Released solar array launch restraints and positioned the stowed arrays for automated deployment. Rotated P4 truss keel pin to stowed position. Removed of 2 of 16 solar array joint launch locks, deployed all 4 solar array joint braces and removed 2 avi... | 386 |
147 | USA | Dan Burbank Steve MacLean | STS-115/12A | 2006-09-13T00:00:00 | 7:11 | ISS based EVA. Removed solar array alpha joint launch locks and restraints. Lost a bolt from a launch lock cover. Release of one launch restraint bolt required a wrench cheater bar and both crew for leverage. Cleared items to permit P3 truss access by the ISS mobile transporter for future assembly work. Secured the vel... | 431 |
148 | USA | Joe Tanner Heide Stefanyshyn-Piper | STS-115/12A | 2006-09-15T00:00:00 | 6:42 | ISS based EVA. Retrieved MISSE-5 experiment. Installed bolt retainers on the P6 beta gimbal struts. Unable to engage hinge lock on P6 beta gimbal strut. Freed snagged tether from mobile transporter. Release P4 radiator launch restraints. Set up two foot restraints for 12A.1. Released bolt torques of P4 MMOD cover. Repl... | 402 |
350 | Russia | Mikhail Tyurin Michael Lopez-Alegria | ISS Incr-14 | 2006-11-22T00:00:00 | 5:38 | Performed golf demo (one ball jettisoned). Inspected but unable to stow Progress antenna. Relocated ATV antenna impairing SM reboost engine. Installed solar radiation experiment (minus data cable) | 338 |
149 | USA | Robert Curbeam Christer Fuglesang | STS-116/12A.1 | 2006-12-12T00:00:00 | 6:36 | ISS based EVA. Removed launch locks from the P5 truss. Aided alignment and secured the P5 truss to the P4 truss. Relocated a radiator grapple fixture. Replaced a failed camera on the S1 truss (13A prep). Performed 13A assembly get-ahead tasks (P5 electrical connections, latch opening, 2 of 4 outboard launch locks). Los... | 396 |
150 | USA | Robert Curbeam Christer Fuglesang | STS-116/12A.1 | 2006-12-14T00:00:00 | 5:00 | ISS based EVA. Reconfigured electrical cables of power channels 2 and 3 and Z1 patch panel. Relocated both CETA carts (13A prep). Installed insulation on the force moment sensors of ISS robotic arm. Installed 4 bags containing fluid line and pump module servicing equipment. | 300 |
151 | USA | Robert Curbeam Sunita Williams | STS-116/12A.1 | 2006-12-16T00:00:00 | 7:31 | ISS based EVA. Reconfigured electrical cables of power channels 1 and 4, Z1 patch panel and Russian power. Transfered Service Module MMOD protection panels to PMA3. Installed the grapple fixture on spare flex hose rotary coupler. Manually aided retraction of the P6 port solar array-completion deferred to next EVA. Lost... | 451 |
152 | USA | Robert Curbeam Christer Fuglesang | STS-116/12A.1 | 2006-12-18T00:00:00 | 6:38 | ISS based EVA. Manually aided full retract of P6 port solar array. Inspected P6 stbd solar array. Adjusted new insulation of SSRMS force sensors | 398 |
153 | USA | Mike Lopez-Alegria Sunita Williams | Incr-14 | 2007-01-31T00:00:00 | 7:55 | ISS based EVA. Established permanent configuration of the electrical and fluid lines of the loop A thermal system. Secured and covered the stowed P6 stbd radiator. Relocated 1 of 2 ammonia servicer jumpers. NH3 leakage induced bakeout and contamination sensing. Installed ISS to Shuttle power transfer cables between Lab... | 475 |
154 | USA | Mike Lopez-Alegria Sunita Williams | Incr-14 | 2007-02-04T00:00:00 | 7:11 | ISS based EVA. Established permanent configuration of the electrical and fluid lines of the loop B thermal system. NH3 leakage induced bakeout and contamination sensing. Relocated ammonia servicer jumper. Secured the stowed P6 aft radiator. Retrieved an MDM thermal shade. Installed ISS to Shuttle power transfer cables ... | 431 |
155 | USA | Mike Lopez-Alegria Sunita Williams | Incr-14 | 2007-02-08T00:00:00 | 6:40 | ISS based EVA. Removed and jettisoned 4 thermal shrouds. Deployed P3 cargo attachment site Removed last 2 launch locks from the P5 truss. Finished installation of ISS to Shuttle power transfer cables and reinstalled an in-cabin reconfigured foot restraint. Photoed PMA2 docked audio connector. | 400 |
351 | Russia | Mikhail Tyurin Michael Lopez-Alegria | ISS Incr-14 | 2007-02-22T00:00:00 | 6:18 | Cut/cleared Progress antenna interfering with undocking. Adjusted ATV antenna interfaces. Replaced a materials experiment. Installed data cable of radiation experiment. Photographed ATV reflectors and numerous experiments. Installed 2 foot restraints outside airlock. Inspected safety of cargo crane mechanisms. Successf... | 378 |
352 | Russia | Fyodor Yurchikhin Oleg Kotov | ISS Incr-15 | 2007-05-30T00:00:00 | 5:25 | Start delayed 45 minutes due to comm misconfig. Transferred MMOD panels from PMA3 to SM and installed 5 of 17 panels. Installed ATV GPS antenna cable. Suit wrist mirror lost overboard. | 325 |
353 | Russia | Fyodor Yurchikhin Oleg Kotov | ISS Incr-15 | 2007-06-06T00:00:00 | 5:37 | Installed SM-FGB cable for local area network (LAN) and Biorisk science experiment. Installed last 12 MMOD shields on SM. | 337 |
156 | USA | Jim Reilly Danny Olivas | STS-117/13A | 2007-06-11T00:00:00 | 6:15 | ISS based EVA. Connected electrical lines btw S1 and S3/S4 trusses. Unstowed solar array blanket boxes and beta gimbals. Stowed the S3/S4 keel. Removed and jettisoned thermal shrouds from 5 avionics boxes. Released restraints for S4 radiator deployment. Engaged drive lock, removed 6 launch locks and rigidized struts of... | 375 |
157 | USA | Pat Forrester Steve Swanson | STS-117/13A | 2007-06-13T00:00:00 | 7:16 | ISS based EVA. Aided retraction of enough bays of P6 solar array to permit alpha joint rotation. Removed 10 of 16 launch locks, deloyed braces and engaged drive lock of S3 solar array alpha joint | 436 |
158 | USA | Danny Olivas Jim Reilly | STS-117/13A | 2007-06-15T00:00:00 | 7:58 | ISS based EVA. Replaced vent valve on Lab for US O2 generator. Secured loose thermal blanket on Shuttle OMS pod. Finished retracting P6 solar array | 478 |
159 | USA | Pat Forrester Steve Swanson | STS-117/13A | 2007-06-17T00:00:00 | 6:29 | ISS based EVA. Opened H2 vent for new US O2 generator. Installed video camera stand. Verified drive lock config and removed 6 launch restraints of the S3 solar array alpha joint. Stowed S3 drag link and keel pin. Released S4 MMOD shield bolts. Cleared MT path. Installed FGB-Node1 local area network cable, but had to su... | 389 |
160 | USA | Clay Anderson Fyodor Yurchikhin | Incr-15 | 2007-07-23T00:00:00 | 7:41 | ISS based EVA. Installed a video camera stand and jettisoned its stowage restraints. Replaced a failed RPCM to restore mobile transporter power redundancy. Jettisoned the early ammonia servicer. Cleaned the Node1 berthing mechanism seal. Relocated the P6 aux bag to Z1, removed failed GPS antenna #4 and released Node 2 ... | 461 |
161 | USA | Rick Mastracchio Dave Williams | STS-118/13A.1 | 2007-08-11T00:00:00 | 6:17 | ISS based EVA. Installed the S5 truss and connected S4-S5 electrical lines. Relocated the radiator grapple fixture on S5. Removed S5-S6 launch locks on S5 and opened the S5-S6 capture latch. Secured the auto retracted P6 radiator. | 377 |
162 | USA | Rick Mastracchio Dave Williams | STS-118/13A.1 | 2007-08-13T00:00:00 | 6:28 | ISS based EVA. Replaced failed CMG 3 and stowed failed unit on pallet outside ISS airlock for return on future Shuttle mission. Photographed MISSE 3 & 4 experiments. | 388 |
163 | USA | Rick Mastracchio Clay Anderson | STS-118/13A.1 | 2007-08-15T00:00:00 | 5:28 | ISS based EVA. Relocated the S-band antenna from P6 to P1 and installed new signal processor and transponder on P1. Retrieved P6 transponder. Relocated CETA carts. Damaged glove terminated EVA early. | 328 |
164 | USA | Dave Williams Clay Anderson | STS-118/13A.1 | 2007-08-18T00:00:00 | 5:02 | ISS based EVA. Installed the Orbiter inspection boom restraints on S1. Engaged S-band antenna gimbal locks on Z1. Retrieved MISSE 3&4 experiments. Installed antennas for external wireless sensors on Lab | 302 |
165 | USA | Scott Parazynski Doug Wheelock | STS-120/10A | 2007-10-26T00:00:00 | 6:14 | ISS based EVA. Stowed old S-band antenna in Shuttle for return. Released launch power cable from Node 2 and temp secured grapple fixture on Node 2. Resecured Node 2 window cover that opened during launch. Demated Z1-P6 fluid lines and covered stowed radiator and avionics box on P6. Did post EVA ammonia cleanup for mino... | 374 |
166 | USA | Scott Parazynski Dan Tani | STS-120/10A | 2007-10-28T00:00:00 | 6:33 | ISS based EVA. Demated Z1 to P6 umbilicals and attachment bolts. Installed Node 2 EVA aids (handrails, foot restraint sockets, slidewire). Removed all Node 2 berthing mechanism pins, but lost one pin within cover. Confirmed handrail on CETA cart not source of glove damage. Inspected starboard solar array alpha joint an... | 393 |
167 | USA | Scott Parazynski Doug Wheelock | STS-120/10A | 2007-10-30T00:00:00 | 7:08 | ISS based EVA. Connected 4 bolts and 4 cables to mate P6 to P5. Inspected port solar array alpha joint and found no issues. Removed solar array avionics thermal shroud. Released P6 radiator restraints to permit deployment. Reconfigured P1 radiator cabling for deploy. Relocated spare MBSU to ISS. Retrieved N2 vent tool,... | 428 |
168 | USA | Scott Parazynski Doug Wheelock | STS-120/10A | 2007-11-03T00:00:00 | 7:19 | ISS based EVA. Inspected and repaired damaged P6 solar array and supported full deployment. Installed 5 "cuff links" as reinforcements for separated panel hinges. Cut frayed snagged hinge and guide wires. Retrieved 2 foot restraints with suspect sharp edges for IVA inspect/correct. Retrieved camera left out by prior EV... | 439 |
169 | USA | Peggy Whitson Yuri Malenchenko | Incr-16 | 2007-11-09T00:00:00 | 6:55 | ISS based EVA. Prepared PMA2 for relocation to Node 2. Demated electrical cables, removed light on Lab and removed thermal cover from Node 2 fwd port. Connected power/data cables for Node 2 grapple fixture. Connected power cable for service module power. Replaced failed RPCM. Reconfigured FGB-PMA1 jumpers. Retrieved S-... | 415 |
170 | USA | Peggy Whitson Dan Tani | Incr-16 | 2007-11-20T00:00:00 | 7:16 | ISS based EVA. Installed stbd thermal cooling lines on Node 2. Connected elec cables to PMA2. Lost wiretie overboard and EV2 biomed signal failed | 436 |
171 | USA | Peggy Whitson Dan Tani | Incr-16 | 2007-11-24T00:00:00 | 7:04 | ISS based EVA. Installed port thermal cooling lines on Node 2. Connected elec cables to PMA2. Inspected and photoed stbd solar array joint | 424 |
172 | USA | Peggy Whitson Dan Tani | Incr-16 | 2007-12-18T00:00:00 | 6:56 | ISS based EVA. Inspected stbd solar array alpha and beta joints. No obvious causes found for rotation issues. Retrieved 1 trundle bearing from alpha joint for in-cabin and ground assessments. | 416 |
173 | USA | Peggy Whitson Dan Tani | Incr-16 | 2008-01-30T00:00:00 | 7:10 | ISS based EVA. Replaced failed solar array beta gimbal unit and inspected alpha joint | 430 |
174 | USA | Rex Walheim Stan Love | STS-122/1E | 2008-02-11T00:00:00 | 7:58 | ISS based EVA. Enabled Columbus installation (demated STS heater cables, installed grapple fixture, removed window & berthing mech covers) and began prep of nitrogen tank transfer by loosening bolts. Accidently found possible source of cut gloves on airlock handrail (MMOD impact) | 478 |
175 | USA | Rex Walheim Hans Schlegel | STS-122/1E | 2008-02-13T00:00:00 | 6:45 | ISS based EVA. Replaced nitrogen tank on P1 truss and installed old tank on Shuttle for earth return. Installed trunnion covers on Columbus | 405 |
176 | USA | Rex Walheim Stan Love | STS-122/1E | 2008-02-15T00:00:00 | 7:25 | ISS based EVA. Installed 2 ESA science experiments, 9 handrails, 2 foot restraint sockets and keel pin cover on Columbus. Transfered failed CMG for Shuttle return. Photographed sharp edge on airlock handrail | 445 |
181 | USA | Robert Behnken Mike Foreman | STS-123/1JA | 2008-03-22T00:00:00 | 6:02 | ISS based EVA. Stowed Shuttle inspection boom on ISS S1 truss with keep alive power. Installed trundle bearing on stbd solar array alpha joint and completed inspections under joint covers. Installed MISSE experiments on pallet outside Columbus (1 reqd light hammering of pip pins). Trunnion covers installed on Japanese ... | 362 |
182 | USA | Mike Fossum Ron Garan | STS-124/1J | 2008-06-03T00:00:00 | 6:48 | ISS based EVA. Released special launch restraint of elbow camera of Shuttle robotic arm. Demated Shuttle inspection boom from ISS truss to permit return/use. Prepared Japanese module for install by demating cables from Shuttle, removing berthing mech covers and releasing window locks. Worked on damaged solar array join... | 408 |
183 | USA | Mike Fossum Ron Garan | STS-124/1J | 2008-06-05T00:00:00 | 7:11 | ISS based EVA. Installed 2 cameras for JEM robot arm op. Removed thermal covers from JEM arm. Prepped JEM berthing mech for stowage module relocation (remove cover, release launch restraints, eliminate insulation interference). Installed JEM trunnion and keep pin covers. Prepped for N2 tank replacement. Retrieved faile... | 431 |
184 | USA | Mike Fossum Ron Garan | STS-124/1J | 2008-06-08T00:00:00 | 6:33 | ISS based EVA. Replaced N2 tank on S1 truss. Reinstalled repaired truss camera. Finished JEM interfaces (window launch locks, berthing mech MMOD shields, robotic arm insulation/launch lock). Sampled port solar array joint contamination. Removed stbd solar array joint launch restraint | 393 |
354 | Russia | Sergei Volkov Oleg Kononenko | ISS Incr-17 | 2008-07-10T00:00:00 | 6:19 | Removed a pyrobolt from 1 of 5 Soyuz capsule restraints. First use of US helmet TV on Orlan. Lost tool and insulation fragments overboard. Jettisoned thruster cover bounced off radiator in wrong direction. | 379 |
355 | Russia | Sergei Volkov Oleg Kononenko | ISS Incr-17 | 2008-07-15T00:00:00 | 5:54 | Prepped for new module (MRM2) installation by installing a SM docking target and inspecting antenna attach points. Installed Vsplesk cosmic radiation experiment and retrieved Biorisk experiment. Unbent a ham radio antenna. | 354 |
185 | USA | Heide Stefanyshyn-Piper Steve Bowen | STS-126/ULF2 | 2008-11-18T00:00:00 | 6:52 | ISS based EVA. Empty N2 tank transferred to Shuttle. Spare flex hose rotary coupler relocated to ISS. Thermal covers removed from JEM ext facility berthing mechanism. Initiated cleaning and lube of stbd SARJ. 2 stbd SARJ trundle bearings replaced and 1 removed. Lost bag of SARJ cleaning/lube tools overboard. As bonus, ... | 412 |
186 | USA | Heide Stefanyshyn-Piper Shane Kimbrough | STS-126/ULF2 | 2008-11-20T00:00:00 | 6:45 | ISS based EVA. Relocated both CETA carts from stbd to port truss to prep for S6 truss assy on next STS flt. Continued replacement of cleaning/lube of stbd solar array joint and replacement of trundle bearings. Overtightened one new trundle bearing and had to use spare. Lubed end effector snares of ISS robotic arm. Reco... | 405 |
187 | USA | Heide Stefanyshyn-Piper Steve Bowen | STS-126/ULF2 | 2008-11-22T00:00:00 | 6:57 | ISS based EVA. Replaced all of the remaining stbd trundle bearings except one. Cleaned and lubed stbd race ring. | 417 |
188 | USA | Steve Bowen Shane Kimbrough | STS-126/ULF2 | 2008-11-24T00:00:00 | 6:07 | ISS based EVA. Lubricated port SARJ race ring. Replaced last trundle bearing on stbd SARJ. Retracted failed latch of JEM ext facility berth mech and installed covers. For HTV, installed 1 of 2 GPS antennas on JEM logistics module for HTV and a camera on P1 truss. Tasks ended early due to higher than expected work rate ... | 367 |
357 | Russia | Yuri Lonchakov Mike Fincke | ISS Incr-18 | 2009-03-10T00:00:00 | 4:48 | Cut off excess length of fabric straps near DC1 antennas and docking target. Reinstalled EXPOSE-R experiment and adjusted orientation of SKK experiment panel. Closed thermal insulation flap over electrical connector panel. Photographed external hardware | 288 |
189 | USA | Steve Swanson Richard Arnold | STS-119/15A | 2009-03-19T00:00:00 | 6:07 | ISS based EVA. Bolted S6 to S5 truss and mated electrical cables. Stowed X6 keel pin, deployed solar array linkages (1 of 4 latches did not engage), removed/jettisoned avionics thermal covers, released radiator restraints and removed blanket box restraints. Deployed S6 avionics MMOD shield | 367 |
190 | USA | Steve Swanson Joseph Acaba | STS-119/15A | 2009-03-21T00:00:00 | 6:30 | ISS based EVA. Loosened restraints of P6 batteries for future replacement. Unable to fully deploy P3 interface for future ORU spares (adj diameter pin suspect). Due to time, deferred S3 payload attach sys deploy. Due to elec conn demate failure, deferred Z1 patch panel reconfig for CMG pwr. Installed JEM GPS antenna. T... | 390 |
191 | USA | Richard Arnold Joseph Acaba | STS-119/15A | 2009-03-23T00:00:00 | 6:27 | ISS based EVA. Relocated one CETA cart from port to stbd side of mobile transporter. Again unable to finish deploy of P3 spares attach sys. Again deferred S3 payload attach deploy and Z1 patch panel reconfig. Lubed robotic arm end effector snares, replaced CETA cart coupler, reconfigured elec conns of truss attach bolt... | 387 |
192 | USA | John Grunsfeld Andrew Feustel | STS-125/HST 4 | 2009-05-14T00:00:00 | 7:20 | HST servicing. Replaced wide field camera (after high torque time consuming bolt release) and science computer. Installed soft capture mechanism for future automated disposal mission. Installed 2 of 3 bolt/latch mechanisms on large doors (after difficulties with alignments). | 440 |
193 | USA | Mike Massimino Mike Good | STS-125/HST 4 | 2009-05-15T00:00:00 | 7:56 | HST servicing. Replaced 3 of 3 gyro packages and 1st group of 3 batteries. Tolerance issue forced installation of 1 non-optimum but adequate spare gyro. Difficulty closing doors to gyro bay. | 476 |
194 | USA | John Grunsfeld Andrew Feustel | STS-125/HST 4 | 2009-05-16T00:00:00 | 6:36 | HST servicing. Replaced COSTAR with cosmic origins spectrograph (COS). Repaired failed advanced camera for surveys (ACS) with removal of 4 detector circuit boards and installation of new power supply and new detector circuit boards | 396 |
195 | USA | Mike Massimino Mike Good | STS-125/HST 4 | 2009-05-17T00:00:00 | 8:02 | HST servicing. Repaired failed space telescope imaging spectrograph (STIS) with new power supply board. Time lost to stuck handrail bolt and failed power tool battery. Ran out of time to install new outer blanket (NOBL) #8. | 482 |
196 | USA | John Grunsfeld Andrew Feustel | STS-125/HST 4 | 2009-05-18T00:00:00 | 7:02 | HST servicing. Installed 2nd/last group of batteries. Replaced fine guidance sensor (FGS). Installed NOBLs 8, 5 and 7 (lots of loose debris with 2nd). Reinstalled low gain antenna cover to permanently protect exposed antenna parts after tip accidently broken off during equipment cleanup | 422 |
358 | Russia | Gennady Padalka Mike Barratt | ISS Incr-19 | 2009-06-05T00:00:00 | 4:54 | First use of new Orlan MK suits with digital caution/warning electronics. Started 1 hour late due to faulty CO2 readings. Installed two docking navigation antennas on zenith port of service module as prep for MRM2 arrival | 294 |
359 | Russia | Gennady Padalka Mike Barratt | ISS Incr-19 | 2009-06-10T00:00:00 | 0:12 | Relocated docking cone to zenith port of Service Module as prep for MRM2 arrival | 12 |
197 | USA | Dave Wolf Tim Kopra | STS-127/2JA | 2009-07-18T00:00:00 | 5:32 | ISS based EVA. Aided JEM exposed facility install by jettisoning berthing mech covers and removing launch heater cable. Aided spares pallet transfer by removing launch heater cable. Removed JEM robot arm ground tab. Opened Node 1 & 2 berthing camera blankets as prep for PMA3 relocate and HTV arrival. Reconfig port CETA... | 332 |
198 | USA | Dave Wolf Tom Marshburn | STS-127/2JA | 2009-07-20T00:00:00 | 6:52 | ISS based EVA. Transfered 3 large spares to ISS. Installed grapple bar on P1 ammonia tank as prep for future replace. Installed 2 of 6 ground connector sleeves for Shuttle to ISS power transfer sys. Comm cap perf poor due to sweat | 412 |
199 | USA | Dave Wolf Chris Cassidy | STS-127/2JA | 2009-07-22T00:00:00 | 5:59 | ISS based EVA. Relocated foot restraint socket for HTV arrival prep. Prepped 3 payloads for robotic install outside JEM. Installed 2 of 6 ground connector sleeves for Shuttle to ISS power transfer sys. Replaced 2 batteries on P6 truss and stowed 2 old batts in Shuttle for return. Stopped early due to suit CO2 increase ... | 359 |
200 | USA | Chris Cassidy Tom Marshburn | STS-127/2JA | 2009-07-24T00:00:00 | 7:12 | ISS based EVA. Replaced 4 batteries on P6 truss and stowed old batts in Shuttle for return. | 432 |
201 | USA | Chris Cassidy Tom Marshburn | STS-127/2JA | 2009-07-27T00:00:00 | 4:54 | ISS based EVA. Adjusted SPDM thermal covers. Reconfiged elec connectors of Z1 patch panel to restore CMG pwr redundancy. Installed two JEM external facility video cameras. Installed JEM handrail, foot restraint socket and gap spanner. Relocated a foot restraint. Due to high use dry out of CO2 can, lacked time to deploy... | 294 |
202 | USA | Danny Olivas Nicole Stott | STS-128/17A | 2009-09-01T00:00:00 | 6:35 | ISS based EVA. Removed NH3 tank from P1 and temp stowed. Transferred MISSE 6a/b & EuTEF experiments to Shuttle | 395 |
203 | USA | Danny Olivas Christer Fugelsang | STS-128/17A | 2009-09-03T00:00:00 | 6:39 | ISS based EVA. Start delayed to redo prebreathe after comm cap readjust. Installed new NH3 tank on P1 and stowed old tank on Shuttle. Installed grapple bar on S1 NH3 tank. Unable to connect PMA3 heater cables due to prior incorrect clocking of PMA3. Installed camera lens covers on station arm as prep for HTV. Relocated... | 399 |
204 | USA | Danny Olivas Christer Fugelsang | STS-128/17A | 2009-09-05T00:00:00 | 7:01 | ISS based EVA. Deployed S3 zenith pallet. Replaced failed rate gyro #2 and RPCM on S0. Installed 2 GPS antennas. Removed Node1 slidewire as prep for Node3. Installed two S0-Node3 cables (one connector unable to mate). Helmet TV camera/lights almost lost overboard due to bumped latches | 421 |
205 | USA | Mike Foreman Robert Satcher | STS-129/ULF3 | 2009-11-19T00:00:00 | 6:37 | ISS based EVA. Installed spare Sband antenna and cables for spare Kuband antenna. Prepped for Node3 install (replace handrail w/ NH3 line bracket). Lubricated end effectors of mobile transporter payload base and JEM robot arm. Installed FGB-Node1 network cable. Deployed S3 payload attach structure | 397 |
206 | USA | Mike Foreman Randy Bresnick | STS-129/ULF3 | 2009-11-21T00:00:00 | 6:08 | ISS based EVA. Installed ham radio antennas on Columbus. Relocated floating potential measure unit from S1 to P1. Deployed the last two payload attach structures and installed wireless video transcvr (all on S3). Retrieved foot restraint for cabin reconfig and relocated tool stanchion. Photographed suspect seals on Nod... | 368 |
207 | USA | Robert Satcher Randy Bresnick | STS-129/ULF3 | 2009-11-23T00:00:00 | 5:42 | ISS based EVA. Start delayed by detached drink bag valve. Relocated some airlock MMOD shields and installed O2 tank outside US airlock. Installed MISSE experiments 7A & 7B on external logistics carrier. Released bolt on NH3 tank. Installed thermal covers on mobile base and two fluid jumpers. Relocated a foot restraint | 342 |
360 | Russia | Oleg Kotov Maxim Suraev | ISS Incr-22 | 2010-01-14T00:00:00 | 5:44 | Prepped new module (MRM2) for Soyuz/Progress usage by installing Kurs navigation antennas/cables and docking targets. Installed 2 hatch handrails, jettisoned excess thermal blankets and retrieved can of Biorisk experiment | 344 |
211 | USA | Rick Mastracchio Clayton Anderson | STS-131/19A | 2010-04-09T00:00:00 | 6:28 | ISS based EVA. Temp stowed new NH3 tank on ISS robot arm. Retrieved JAXAA's MPAC/SEED experiment for return. Replaced rate gyro assembly #1. Relocated a foot restraint socket extender. Removed P1 flex hose rotary coupler launch restraint bolts and released cable clamps. Tightened grapple fixture attachment bolts of old... | 388 |
212 | USA | Rick Mastracchio Clayton Anderson | STS-131/19A | 2010-04-11T00:00:00 | 7:26 | ISS based EVA. Removed old NH3 tank and temp stowed on CETA cart. Overcame a troublesome bolt and installed new NH3 tank/cables. Installed 2 radiator grapple beams and relocated a foot restraint | 446 |