eva_number int64 1 371 ⌀ | country stringclasses 2
values | crew stringlengths 8 40 | vehicle stringlengths 5 31 ⌀ | date timestamp[ns]date 1965-06-03 00:00:00 2013-08-22 00:00:00 ⌀ | duration stringlengths 4 4 ⌀ | purpose stringlengths 24 652 ⌀ | duration_minutes float64 0 536 ⌀ |
|---|---|---|---|---|---|---|---|
213 | USA | Rick Mastracchio Clayton Anderson | STS-131/19A | 2010-04-13T00:00:00 | 6:24 | ISS based EVA. Finished installing new NH3 tank (fluid lines). Stowed old NH3 tank (despite a balky bolt) and airlock MMOD shields for Shuttle return. Relocated grapple fixture from old tank to new tank. As prep for next Shuttle flt, relocated foot restraint and prepped cables for spare Sband antenna | 384 |
214 | USA | Garrett Reisman Steve Bowen | STS-132/ULF4 | 2010-05-17T00:00:00 | 7:25 | ISS based EVA. Installed an operational spare Ku antenna boom and dish on Z1. Installed ORU holder on SPDM. Loosened bolts on new batteries for P6 | 445 |
215 | USA | Steve Bowen Michael Good | STS-132/ULF4 | 2010-05-19T00:00:00 | 7:09 | ISS based EVA. Unsnagged cable of orbiter inspection boom sensor. Replaced 4 batteries on P6. Finished bolting Ku antenna dish to boom and releasing launch locks | 429 |
216 | USA | Garrett Reisman Michael Good | STS-132/ULF4 | 2010-05-21T00:00:00 | 6:46 | ISS based EVA. Installed NH3 jumper on port truss. Replaced 2 batteries on P6. Transferred grapple fixture to ISS for later install on FGB. | 406 |
361 | Russia | Fyodor Yurchikin Mikhail Kornienko | ISS Incr-24 | 2010-07-27T00:00:00 | 6:42 | Replaced degraded ATV docking camera and jettisoned old unit. Removed launch restraints from MRM1 camera. Installed cables to enable dockings to MRM1. Lost cable clamp | 402 |
217 | USA | Doug Wheellock Tracy Caldwell Dyson | Incr-24 | 2010-08-07T00:00:00 | 8:03 | ISS based EVA. Demated 3 of 4 NH3 connectors from failed coolant pump, but the 4th leaked and was left installed. Ended work to do suit decontamination. EV2 CO2 sensor failed | 483 |
218 | USA | Doug Wheellock Tracy Caldwell Dyson | Incr-24 | 2010-08-11T00:00:00 | 7:26 | ISS based EVA. After remote cmds reduced upstream pressure, demated 4th NH3 connector and then demated electrical connectors. Installed grapple fixture, unbolted old pump, temp stowed it and then demated electrical connectors of new pump | 446 |
219 | USA | Doug Wheellock Tracy Caldwell Dyson | Incr-24 | 2010-08-16T00:00:00 | 7:20 | ISS based EVA. Installed new coolant pump and stowed support equipment. Connected CETA carts to mobile transporter for unobstructed remote cmd translation. | 440 |
362 | Russia | Fyodor Yurchikin Oleg Skripochka | ISS Incr-25 | 2010-10-15T00:00:00 | 6:27 | Installed experiment platform on SM large diameter, CKK materials experiment on MRM2 and two handrail gap spanners. Collected sample wipes of prop byproducts and microbes from thermal blankets. Retrieved ROKVISS robot experiment and jettisoned wipedown towels. Removed but not able to relocate MRM1 TV camera due to ther... | 387 |
363 | Russia | Dmitry Kondratiev Oleg Skripochka | ISS Incr-26 | 2011-01-21T00:00:00 | 5:23 | Installed 100Mb/sec data downlink antenna and its cables. Retrieved plasma and ExposeR materials exposure experiments. Finished installation of MRM1 docking TV camera by cutting into impeding thermal blanket. Jettisoned antenna cover and cable reel | 323 |
364 | Russia | Dmitry Kondratiev Oleg Skripochka | ISS Incr-26 | 2011-02-16T00:00:00 | 4:51 | Installed Photon-Gamma and Radiometria experiments on SM. Jettisoned foot restraint. Retrieved Komplast panels from FGB. | 291 |
220 | USA | Steve Bowen Alvin Drew | STS-133/ULF5 | 2011-02-28T00:00:00 | 6:34 | ISS based EVA. Installed backup power cable for new stowage module. Relocated failed pump module and prepped it for NH3 venting to enable future return. Repositioned Z1 truss RPCM thermal blanket and an EVA foot restraint socket extension. Retrieved foot restraint for incabin maintenance. Added wedge to S1 camera for c... | 394 |
221 | USA | Steve Bowen Alvin Drew | STS-133/ULF5 | 2011-03-02T00:00:00 | 6:14 | ISS based EVA. Late start due to suit leak from damaged CO2 can O-ring. Vented NH3 from failed pump module enabling future return. Retrieved tool stowage bags used in past pump replacement. Installed light on port CETA cart, camera on SPDM robot and 3 camera lens covers. Repositioned camera sunshade for clear view. Res... | 374 |
222 | USA | Andrew Feustel Greg Chamitoff | STS-134/ULF6 | 2011-05-20T00:00:00 | 6:19 | ISS based EVA. Retrieved MISSE 7. Installed MISSE 8, light on S3, stbd SARJ cover and port truss NH3 jumper (for radiator leak topoff). Vented N2 from port NH3 servicer lines and disconnected line across SARJ for overnight motions. Mechanically installed 2 payload wireless antennas on Lab, but did not finish connecting... | 379 |
223 | USA | Andrew Feustel Mike Fincke | STS-134/ULF6 | 2011-05-22T00:00:00 | 8:07 | ISS based EVA. Reconnected fill line, refilled P6 radiator NH3, vented refill lines and disconnected line across SARJ. Did suit solar bakeout due to suspected NH2 leak from disconnect. Lubricated 1/3 of port SARJ (lost 1 bolt & 3 washers from joint covers, one cover returned to airlock due to too few remaining bolts) a... | 487 |
224 | USA | Andrew Feustel Mike Fincke | STS-134/ULF6 | 2011-05-25T00:00:00 | 6:54 | ISS based EVA. Installed FGB PDGF/stand, video signal conditioner and a portion of associated cables. Installed cables for backup power from US to Russian segment. Finished installing cables under MMOD shields for 2 payload wireless antennas. Installed thermal blanket on airlock O2 tank grapple fixture. Infrared video ... | 414 |
225 | USA | Mike Fincke Greg Chamitoff | STS-134/ULF6 | 2011-05-27T00:00:00 | 7:24 | ISS based EVA. Permanently stowed orbiter inspection boom on ISS to expand future EVA/robotic reach for maint. Removed P6 PDGF and installed on orbiter boom in place of EFGF to enable SSRMS handling. Released expandable diam fasteners of spare SPDM arm. EV2 topped off suit O2. Took photos of DOD experiments. | 444 |
226 | USA | Ron Garan Mike Fossum | ISS-Incr 28 during STS-135/ULF7 | 2011-07-12T00:00:00 | 6:31 | ISS based EVA. Transfered failed 1400lb pump module from ISS to Shuttle for return. Transfered GSFC's satellite robotic refueling demo unit from Shuttle to ISS. Add MISSE 8's ORMATE optical mirror experiment to ISS. As getaheads, installed PMA3 thermal cover, repositioned FGB PDGF's obstructing ground wire under therma... | 391 |
365 | Russia | Sergei Volkov Alexander Samokutyaev | ISS Incr-28 | 2011-08-03T00:00:00 | 6:23 | Installed laser comm and Biorisk experiments. Jettisoned covers of laser experiment. After delay due to broken rcvr antenna, deployed ham radio satellite Radioskaf-V/Arissat-1. Removed SM-MRM1 Kurs antenna from SM. Took photos of materials experiments, degraded antenna and images of Russian space heroes. Due to time, d... | 383 |
366 | Russia | Oleg Kononenko Anton Shkaplerov | ISS Incr-30 | 2012-02-16T00:00:00 | 6:15 | Relocated 1st strela crane from DC1 to MRM1 and jettisoned base thermal cover. Installed materials exposure experiment and took 1 of 2 swab samples of contamination under thermal blanket. Due to time, did not install SM MMOD shields | 375 |
367 | Russia | Gennady Padalka Yuri Malenchenko | ISS Incr-32 | 2012-08-20T00:00:00 | 5:51 | 1 hr late start due to airlock valve. Relocated cargo crane from DC1 to FGB as prep for MLM. Installed MMOD shields on Service Module and support struts for airlock exit ladder. Deployed small satellite and retrieved Biorisk experiment canister | 351 |
227 | USA | Sunita Williams Akihiko Hoshide | ISS-Incr 32 | 2012-08-30T00:00:00 | 8:17 | ISS based EVA. Installed 1 of 2 power cables for future MLM use. Removed and stowed failed MBSU. Unable to install new MBSU and left it tied down. Contaminated sublimator plate reduced cooling at end of EVA and led to suit declared no-go for future | 497 |
228 | USA | Sunita Williams Akihiko Hoshide | ISS-Incr 32 | 2012-09-05T00:00:00 | 6:28 | ISS based EVA. Removed MBSU after releasing alignment sensitive bolt. Photographed, inspected, cleaned and lubricated mechanical bolts and receptacles. Ran spare bolt in and out of receptacle to smooth threads. Using basic manual wrench for alignment touch, MBSU was bolted down. Failed SSRMS camera replaced. | 388 |
229 | USA | Sunita Williams Akihiko Hoshide | ISS-Incr 32 | 2012-11-01T00:00:00 | 6:38 | Bypassed coolant system ammonia leak with jumper connections and backup radiator deployment. Inspected solar array joint for cause of recent increase in friction. | 398 |
368 | Russia | Pavel Vinogradov Roman Romanenko | ISS Incr-35 | 2013-04-19T00:00:00 | 6:38 | Installed plasma experiment/cables/probes, replaced degraded ATV navigation reflector, jettisoned cable reel, towels and probe boxes, retrieved biorisk canister. Lost materials exposure experiment overboard | 398 |
230 | USA | Chris Cassidy Tom Marshburn | ISS Incr-35 | 2013-05-11T00:00:00 | 5:31 | Replaced P6 truss pump flow control system box due to leak in coolant system. Stowed old unit. Performed precautionary ammonia bakeout. | 331 |
369 | Russia | Fyodor Yurchikhin Alexander Misurkin | ISS Incr-36 | 2013-06-24T00:00:00 | 6:34 | Power cable clamps installed and Kurs tested in prep for MLM. Replaced FGB flow control valve. Installed INDICATOR of CONTROL space experiment on MRM2. Removed VINOSLIVOST experiment from MRM-2 and PHOTON-GAMMA from SM. Installed 3 of 5 SM handrail gap spanners | 394 |
231 | USA | Chris Cassidy Luca Parmitano | ISS Incr-36 | 2013-07-09T00:00:00 | 6:07 | Replaced failed Ku antenna avionics. Retrieved 2 materials exposure experiments. Took photos of contaminated radiator of AMS. Installed 2 radiator grapple bars. Routed MLM power cable to FGB. Removed failed camera of mobile transporter. Installed PMA2 MMOD cover, Z1 bypass jumper power cables and MLM data cable. Cleare... | 367 |
232 | USA | Chris Cassidy Luca Parmitano | ISS Incr-36 | 2013-07-16T00:00:00 | 1:32 | EVA terminated early due to free water in EV2's helmet. Completed install of Z1 bypass jumper cable and FGB PDGF data cable. Partially routed MLM data cable. | 92 |
370 | Russia | Fyodor Yurchikhin Alexander Misurkin | ISS Incr-36 | 2013-08-16T00:00:00 | 7:29 | ÃÂ Installed VINOSLIVOST experiment on MRM2, 2 MLMÃÂUSOS power cables, FGB ÃÂ MRM2 gap spanners, MLM-USOS ETHERNET cable ÃÂ Installation of gap spanners SM ÃÂ MRM2 (if time allows) ÃÂ Retracted & stowed Strela-1 on DC1 | 449 |
371 | Russia | Fyodor Yurchikhin Alexander Misurkin | ISS Incr-36 | 2013-08-22T00:00:00 | 5:58 | ÃÂ Retrieved laser downlink comm experiment from SM and replaced it with a biaxial camera pointing system. ÃÂ Inspected all 6 ATV WAL PCE antennas and tightened loose screws that lost an antenna cover overboard. ÃÂ collected surface ÃÂTestÃÂ samples on MRM2 EV Hatch 2 ÃÂ Installed 2 gap spanners on SM Displ... | 358 |
2 | USA | David Scott | Gemini VIII | null | 0:00 | HHMU EVA cancelled before starting by stuck on vehicle thruster that ended mission early | 0 |
77 | USA | Leroy Chiao Dan Barry | STS-72 | null | 6:09 | ISS umbilical tests with robotically transported portable work platform. Elec cuff checklist demo. | 369 |
78 | USA | Leroy Chiao Winston Scott | null | null | 6:53 | ISS thermal comfort test, cable tray test, APFR load test. Thermal cube experiment | 413 |
79 | USA | Linda Godwin Rich Clifford | STS-76 | null | 6:03 | Deploy 4 MEEP materials experiments on Mir docking module. Test US/Russian tether and PFR. Retrieve camera from docking module exterior | 363 |
80 | USA | Mark Lee Steve Smith | STS-82 / HST-2 | null | 6:42 | HST servicing (first STS external airlock sortie, depress gas flow disturbed HST solar arrays, remove/install GHRS/STIS, FOS/NICMOS ) | 402 |
81 | USA | Greg Harbaugh Joe Tanner | STS-82 / HST-2 | null | 7:27 | HST servicing (remove/install FGS-1/FGS-1R, replace ESTR-2, install OCE enhancement kit) | 447 |
82 | USA | Mark Lee Steve Smith | STS-82 / HST-2 | null | 7:11 | HST servicing (remove/install DUI-2/DIU-2R, ESTR-1/SSR, replace RWA) | 431 |
83 | USA | Greg Harbaugh Joe Tanner | STS-82 / HST-2 | null | 6:34 | HST servicing (replace SADE, install MSS cover, retrieve degraded MLI sample, install MLI patches) | 394 |
84 | USA | Mark Lee Steve Smith | STS-82 / HST-2 | null | 5:17 | HST servicing (unscheduled EVA to add protective covers over degrading aluminized insulation) | 317 |
85 | USA | Scott Parazynski Vladimir Titov | STS-86 | null | 5:01 | Retrieve 4 MEEP materials experiments on Mir docking module. Test US/Russian tethers and PFR. US safety tether would not retract. Deploy Spektr solar array base sealing cap on docking module. | 301 |
177 | USA | Rick Linnehan Garrett Reisman | STS-123/1JA | null | 7:01 | ISS based EVA. Enabled installation of Japanese logisics module by demating heater cables and removed berthing mechanism covers. Installed tool devices on Canadian SPDM robot arms. Marked sharp edge on airlock handrail with wiretie and found 2nd sharp edge on portable handle | 421 |
178 | USA | Rick Linnehan Mike Foreman | STS-123/1JA | null | 7:08 | ISS based EVA. Installed both arms on Canadian SPDM robot. Had to use prybar to release 2 expandable dia fasteners | 428 |
179 | USA | Rick Linnehan Robert Behnken | STS-123/1JA | null | 6:53 | ISS based EVA. Installed cameras, lights and tool and spares holders on SPDM. Removed all but a few blankets from SPDM. Readied SPDM's spacelab pallet for return via Shuttle. Transferred spares from Shuttle to ISS (robotic yaw joint, 2 DCSU). Installed experiment pallet on Columbus. Unable to install MISSE experiments ... | 413 |
180 | USA | Robert Behnken Mike Foreman | STS-123/1JA | null | 6:24 | ISS based EVA. Replaced failed RPCM to permit separate power to CMG2, but not able to demate elec connector of Z1 patch panel to enable power reconfig. Tested Shuttle tile repair materials, tools and techniques. Released launch locks of Node 2 nadir and port berth mech. Removed last thermal cover from SPDM hand. Did no... | 384 |
208 | USA | Bob Behnken Nick Patrick | STS-130/20A | null | 6:32 | ISS based EVA. Prepared Node 3 for ISS install by removing covers and heater cables. Prepositioned ammonia lines and thermal covers. Installed Node 3 avionics and heater cables. Removed/stowed the SPDM ORU Temporary Platform (OTP). Relocated NH3 jumper bag and released tape restraining Node 3 gap spanners. One suit fan... | 392 |
209 | USA | Bob Behnken Nick Patrick | STS-130/20A | null | 5:53 | ISS based EVA. Outfitted Node 3 by installing 2 NH3 lines, heater cables, trunnion/keel thermal covers, negative pressure vent, handrail gap spanners and 8 handrails. Opened loop A NH3 line and nadir berthing mechanism pedals and centerline camera thermal cover. Visually verified berthing seals OK. Small NH3 leak induc... | 353 |
210 | USA | Bob Behnken Nick Patrick | STS-130/20A | null | 5:48 | ISS based EVA. Connected PMA3 heater and data cables. Opened loop B NH3 line. Disconnected Node 3 temp heater cable. Removed Cupola thermal covers and released launch locks of window shutters Installed Node 3 handrails, foot restraint sockets and a handrail gap spanner. Routed FGB grapple fixture video cable. Closed No... | 348 |
233 | Russia | Alexei Leonov | Voskhod 2 | null | 0:12 | WorldÃÂs first EVA, Berkut umbilical suit, Volga inflatable airlock. Had to partially reduce suit pressure to turnaround in airlock and close hatch | 12 |
234 | Russia | Aleksei Yeliseyov Yevgeni Khrunov | Soyuz 4&5 | null | 0:37 | New airlock, Yastreb self-contained life support suit, vehicle-vehicle EVA crew transfer. Lost camera | 37 |
235 | Russia | Victor Lazerov Oleg Makarov | Soyuz 12 | null | 0:00 | New Orlan D suits checked out inside cabin | 0 |
236 | Russia | Yuri Romanenko Georgi Grechko | Soyuz 26 Salyut 6 | null | 1:28 | Docking unit inspection. Tested new Orlan D suits. G. saves R. from untethered loss out of airlock. Both always attached via umbilicals?? | 88 |
240 | Russia | Vladimir Lyakhov Alexandr Alexandrov | Soyuz T-9 Salyut 7 | null | 2:49 | After in-cabin improvised repair of damaged suit leg bladder using aluminum ring and rubber, installed one solar array addition | 169 |
241 | Russia | Vladimir Lyakhov Alexandr Alexandrov | Soyuz T-9 Salyut 7 | null | 2:55 | Install second solar array addition | 175 |
249 | Russia | Vladimir Dzhanibekov Victor Savinykh | Soyuz T-13 Salyut 7 | null | 4:58 | Install solar array addition (2), install French ISTOK-EM micro-meteroid collectors, test new Orlan DM suit | 298 |
255 | Russia | Vladimir Titov Musa Manarov | Soyuz TM-4 Mir | null | 4:10 | Disassemble modified arrays, install test arrays | 250 |
257 | Russia | Vladimir Titov Musa Manarov | Soyuz TM-4 Mir | null | 4:12 | Complete replacement of telescope detector module, use new Orlan DMAÃÂs | 252 |
258 | Russia | Alexandr Volkov Jean-Louc Chretien | Soyuz TM-7 Mir | null | 5:57 | French ERA truss experiment deploy and jettison. Deploy Enchantillon materials experiment | 357 |
262 | Russia | Alexandr Viktorenko Alexandr Serebrov | Soyuz TM-8 Mir | null | 4:59 | Checkout Kvant 2 airlock & new Orlan DMA. MMU flown tethered for 40 min to 33m. | 299 |
263 | Russia | Alexandr Viktorenko Alexandr Serebrov | Soyuz TM-8 Mir | null | 3:45 | Checkout Kvant 2 airlock & new Orlan DMA. MMU flown tethered for 93 min to 45m. SPIN-6000 rad sensor on MMU | 225 |
277 | Russia | Alexandr Volkov Sergei Krikalev | Soyuz TM-13 Mir | null | 4:13 | V. suit cooling sublimator failed so must stay on umbilical. Base block solar panel section collected. Material experiments deployed and retrieved on Kvant2 (Sprut, SKK, DankoM, Plenka) | 253 |
279 | Russia | Anatoli Solovyov Sergei Avdeyev | Soyuz TM-15 Mir | null | 3:56 | Prepare 700kg thruster box for Sofora truss. Install truss hinge lock | 236 |
280 | Russia | Anatoli Solovyov Sergei Avdeyev | Soyuz TM-15 Mir | null | 5:08 | Install thruster control cables on Sofora truss. Attach truss to thruster box mounted on Progress | 308 |
288 | Russia | Valeri Tsibliyev Alexandr Serebrov | Soyuz TM-17 Mir 16 | null | 0:37 | Exterior inspections started. SKK science deployed. O2 failure in S's suit stops work | 37 |
289 | Russia | Valeri Tsibliyev Alexandr Serebrov | Soyuz TM-17 Mir 16 | null | 4:12 | Complete Panorama exterior inspections, discard used Orlan suit | 252 |
290 | Russia | Yuri Malenchenko Talgat Musabeyev | Soyuz TM-18 Mir 17 | null | 5:05 | Inspect Progress docking system, prepare base for 2nd cargo boom (with hole punch), material science deployed/retrieved (Platan 4/5, SKK) | 305 |
300 | Russia | Sergei Avdeyev Thomas Reiter | Soyuz TM-X Mir 20 | null | 5:16 | Deploy ESEF materials experiment and replace Komza cassettes on Spektr | 316 |
301 | Russia | Sergei Avdeyev Yuri Gidzenko | Soyuz TM-X Mir 20 | null | 0:32 | Move base block docking port as prep for Priroda docking | 32 |
302 | Russia | Yuri Gidzenko Thomas Reiter | Soyuz TM-X Mir 20 | null | 3:06 | Retrieve ESEF sample cassettes from Spektr. Relocate MMU to stow site on Kvant-2 exterior | 186 |
303 | Russia | Yuri Onufrenko Yuri Usachev | Soyuz TM-23 Mir 21 | null | 5:51 | Deploy second cargo crane. Prepare solar array install site on Kvant-1 | 351 |
309 | Russia | Valery Korzun Alexander Kaleri | Soyuz TM-24 Mir 22 | null | 5:57 | Install last 1/2 of cables for cooperative array on Kvant-1. Connect solar array power cables on base block. Relocate Rapana truss to Ferma-3 truss | 357 |
310 | Russia | Valery Korzun Alexander Kaleri | Soyuz TM-24 Mir 22 | null | 6:36 | Install Kurs antenna on docking module (including routing/mating cable to Kristall). Tighten connector of amateur radio antenna on base block | 396 |
349 | Russia | Pavel Vinogradov Jeff Williams | ISS Incr-13 | null | 6:31 | Installed new hydrogen vent for Elektron O2 generator. Retrieved Kromka, BKHD and Biorisk experiments. Relocated ATV WAL3 antenna cable to improve system performance. Photographed ATV WAL2 antenna and SM reboost engine to aid engine cover troubleshooting. Lost crane foot restraint adapter. Replaced MBS camera (EVA exte... | 391 |
356 | Russia | Yuri Lonchakov Mike Fincke | ISS Incr-18 | null | 5:39 | Installed Langmuir probe to aid Soyuz reentry sep analysis. Retrieved a BIORISK can. Installed EXPOSE R and Impulse experiments. Had to deinstall and return EXPOSE R to cabin when it wouldnÃÂt activate. Deferred other tasks. Failed valve forced use of stored gas to repress airlock. | 339 |
null | USA | Tom Jones Tammy Jernigan | STS-80 | null | 0:00 | Loose screw jammed in hatch latch actuator prevented airlock egress | 0 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.