eva_number
int64
1
371
country
stringclasses
2 values
crew
stringlengths
8
40
vehicle
stringlengths
5
31
date
timestamp[ns]date
1965-06-03 00:00:00
2013-08-22 00:00:00
duration
stringlengths
4
4
purpose
stringlengths
24
652
duration_minutes
float64
0
536
213
USA
Rick Mastracchio Clayton Anderson
STS-131/19A
2010-04-13T00:00:00
6:24
ISS based EVA. Finished installing new NH3 tank (fluid lines). Stowed old NH3 tank (despite a balky bolt) and airlock MMOD shields for Shuttle return. Relocated grapple fixture from old tank to new tank. As prep for next Shuttle flt, relocated foot restraint and prepped cables for spare Sband antenna
384
214
USA
Garrett Reisman Steve Bowen
STS-132/ULF4
2010-05-17T00:00:00
7:25
ISS based EVA. Installed an operational spare Ku antenna boom and dish on Z1. Installed ORU holder on SPDM. Loosened bolts on new batteries for P6
445
215
USA
Steve Bowen Michael Good
STS-132/ULF4
2010-05-19T00:00:00
7:09
ISS based EVA. Unsnagged cable of orbiter inspection boom sensor. Replaced 4 batteries on P6. Finished bolting Ku antenna dish to boom and releasing launch locks
429
216
USA
Garrett Reisman Michael Good
STS-132/ULF4
2010-05-21T00:00:00
6:46
ISS based EVA. Installed NH3 jumper on port truss. Replaced 2 batteries on P6. Transferred grapple fixture to ISS for later install on FGB.
406
361
Russia
Fyodor Yurchikin Mikhail Kornienko
ISS Incr-24
2010-07-27T00:00:00
6:42
Replaced degraded ATV docking camera and jettisoned old unit. Removed launch restraints from MRM1 camera. Installed cables to enable dockings to MRM1. Lost cable clamp
402
217
USA
Doug Wheellock Tracy Caldwell Dyson
Incr-24
2010-08-07T00:00:00
8:03
ISS based EVA. Demated 3 of 4 NH3 connectors from failed coolant pump, but the 4th leaked and was left installed. Ended work to do suit decontamination. EV2 CO2 sensor failed
483
218
USA
Doug Wheellock Tracy Caldwell Dyson
Incr-24
2010-08-11T00:00:00
7:26
ISS based EVA. After remote cmds reduced upstream pressure, demated 4th NH3 connector and then demated electrical connectors. Installed grapple fixture, unbolted old pump, temp stowed it and then demated electrical connectors of new pump
446
219
USA
Doug Wheellock Tracy Caldwell Dyson
Incr-24
2010-08-16T00:00:00
7:20
ISS based EVA. Installed new coolant pump and stowed support equipment. Connected CETA carts to mobile transporter for unobstructed remote cmd translation.
440
362
Russia
Fyodor Yurchikin Oleg Skripochka
ISS Incr-25
2010-10-15T00:00:00
6:27
Installed experiment platform on SM large diameter, CKK materials experiment on MRM2 and two handrail gap spanners. Collected sample wipes of prop byproducts and microbes from thermal blankets. Retrieved ROKVISS robot experiment and jettisoned wipedown towels. Removed but not able to relocate MRM1 TV camera due to ther...
387
363
Russia
Dmitry Kondratiev Oleg Skripochka
ISS Incr-26
2011-01-21T00:00:00
5:23
Installed 100Mb/sec data downlink antenna and its cables. Retrieved plasma and ExposeR materials exposure experiments. Finished installation of MRM1 docking TV camera by cutting into impeding thermal blanket. Jettisoned antenna cover and cable reel
323
364
Russia
Dmitry Kondratiev Oleg Skripochka
ISS Incr-26
2011-02-16T00:00:00
4:51
Installed Photon-Gamma and Radiometria experiments on SM. Jettisoned foot restraint. Retrieved Komplast panels from FGB.
291
220
USA
Steve Bowen Alvin Drew
STS-133/ULF5
2011-02-28T00:00:00
6:34
ISS based EVA. Installed backup power cable for new stowage module. Relocated failed pump module and prepped it for NH3 venting to enable future return. Repositioned Z1 truss RPCM thermal blanket and an EVA foot restraint socket extension. Retrieved foot restraint for incabin maintenance. Added wedge to S1 camera for c...
394
221
USA
Steve Bowen Alvin Drew
STS-133/ULF5
2011-03-02T00:00:00
6:14
ISS based EVA. Late start due to suit leak from damaged CO2 can O-ring. Vented NH3 from failed pump module enabling future return. Retrieved tool stowage bags used in past pump replacement. Installed light on port CETA cart, camera on SPDM robot and 3 camera lens covers. Repositioned camera sunshade for clear view. Res...
374
222
USA
Andrew Feustel Greg Chamitoff
STS-134/ULF6
2011-05-20T00:00:00
6:19
ISS based EVA. Retrieved MISSE 7. Installed MISSE 8, light on S3, stbd SARJ cover and port truss NH3 jumper (for radiator leak topoff). Vented N2 from port NH3 servicer lines and disconnected line across SARJ for overnight motions. Mechanically installed 2 payload wireless antennas on Lab, but did not finish connecting...
379
223
USA
Andrew Feustel Mike Fincke
STS-134/ULF6
2011-05-22T00:00:00
8:07
ISS based EVA. Reconnected fill line, refilled P6 radiator NH3, vented refill lines and disconnected line across SARJ. Did suit solar bakeout due to suspected NH2 leak from disconnect. Lubricated 1/3 of port SARJ (lost 1 bolt & 3 washers from joint covers, one cover returned to airlock due to too few remaining bolts) a...
487
224
USA
Andrew Feustel Mike Fincke
STS-134/ULF6
2011-05-25T00:00:00
6:54
ISS based EVA. Installed FGB PDGF/stand, video signal conditioner and a portion of associated cables. Installed cables for backup power from US to Russian segment. Finished installing cables under MMOD shields for 2 payload wireless antennas. Installed thermal blanket on airlock O2 tank grapple fixture. Infrared video ...
414
225
USA
Mike Fincke Greg Chamitoff
STS-134/ULF6
2011-05-27T00:00:00
7:24
ISS based EVA. Permanently stowed orbiter inspection boom on ISS to expand future EVA/robotic reach for maint. Removed P6 PDGF and installed on orbiter boom in place of EFGF to enable SSRMS handling. Released expandable diam fasteners of spare SPDM arm. EV2 topped off suit O2. Took photos of DOD experiments.
444
226
USA
Ron Garan Mike Fossum
ISS-Incr 28 during STS-135/ULF7
2011-07-12T00:00:00
6:31
ISS based EVA. Transfered failed 1400lb pump module from ISS to Shuttle for return. Transfered GSFC's satellite robotic refueling demo unit from Shuttle to ISS. Add MISSE 8's ORMATE optical mirror experiment to ISS. As getaheads, installed PMA3 thermal cover, repositioned FGB PDGF's obstructing ground wire under therma...
391
365
Russia
Sergei Volkov Alexander Samokutyaev
ISS Incr-28
2011-08-03T00:00:00
6:23
Installed laser comm and Biorisk experiments. Jettisoned covers of laser experiment. After delay due to broken rcvr antenna, deployed ham radio satellite Radioskaf-V/Arissat-1. Removed SM-MRM1 Kurs antenna from SM. Took photos of materials experiments, degraded antenna and images of Russian space heroes. Due to time, d...
383
366
Russia
Oleg Kononenko Anton Shkaplerov
ISS Incr-30
2012-02-16T00:00:00
6:15
Relocated 1st strela crane from DC1 to MRM1 and jettisoned base thermal cover. Installed materials exposure experiment and took 1 of 2 swab samples of contamination under thermal blanket. Due to time, did not install SM MMOD shields
375
367
Russia
Gennady Padalka Yuri Malenchenko
ISS Incr-32
2012-08-20T00:00:00
5:51
1 hr late start due to airlock valve. Relocated cargo crane from DC1 to FGB as prep for MLM. Installed MMOD shields on Service Module and support struts for airlock exit ladder. Deployed small satellite and retrieved Biorisk experiment canister
351
227
USA
Sunita Williams Akihiko Hoshide
ISS-Incr 32
2012-08-30T00:00:00
8:17
ISS based EVA. Installed 1 of 2 power cables for future MLM use. Removed and stowed failed MBSU. Unable to install new MBSU and left it tied down. Contaminated sublimator plate reduced cooling at end of EVA and led to suit declared no-go for future
497
228
USA
Sunita Williams Akihiko Hoshide
ISS-Incr 32
2012-09-05T00:00:00
6:28
ISS based EVA. Removed MBSU after releasing alignment sensitive bolt. Photographed, inspected, cleaned and lubricated mechanical bolts and receptacles. Ran spare bolt in and out of receptacle to smooth threads. Using basic manual wrench for alignment touch, MBSU was bolted down. Failed SSRMS camera replaced.
388
229
USA
Sunita Williams Akihiko Hoshide
ISS-Incr 32
2012-11-01T00:00:00
6:38
Bypassed coolant system ammonia leak with jumper connections and backup radiator deployment. Inspected solar array joint for cause of recent increase in friction.
398
368
Russia
Pavel Vinogradov Roman Romanenko
ISS Incr-35
2013-04-19T00:00:00
6:38
Installed plasma experiment/cables/probes, replaced degraded ATV navigation reflector, jettisoned cable reel, towels and probe boxes, retrieved biorisk canister. Lost materials exposure experiment overboard
398
230
USA
Chris Cassidy Tom Marshburn
ISS Incr-35
2013-05-11T00:00:00
5:31
Replaced P6 truss pump flow control system box due to leak in coolant system. Stowed old unit. Performed precautionary ammonia bakeout.
331
369
Russia
Fyodor Yurchikhin Alexander Misurkin
ISS Incr-36
2013-06-24T00:00:00
6:34
Power cable clamps installed and Kurs tested in prep for MLM. Replaced FGB flow control valve. Installed INDICATOR of CONTROL space experiment on MRM2. Removed VINOSLIVOST experiment from MRM-2 and PHOTON-GAMMA from SM. Installed 3 of 5 SM handrail gap spanners
394
231
USA
Chris Cassidy Luca Parmitano
ISS Incr-36
2013-07-09T00:00:00
6:07
Replaced failed Ku antenna avionics. Retrieved 2 materials exposure experiments. Took photos of contaminated radiator of AMS. Installed 2 radiator grapple bars. Routed MLM power cable to FGB. Removed failed camera of mobile transporter. Installed PMA2 MMOD cover, Z1 bypass jumper power cables and MLM data cable. Cleare...
367
232
USA
Chris Cassidy Luca Parmitano
ISS Incr-36
2013-07-16T00:00:00
1:32
EVA terminated early due to free water in EV2's helmet. Completed install of Z1 bypass jumper cable and FGB PDGF data cable. Partially routed MLM data cable.
92
370
Russia
Fyodor Yurchikhin Alexander Misurkin
ISS Incr-36
2013-08-16T00:00:00
7:29
• Installed VINOSLIVOST experiment on MRM2, 2 MLM–USOS power cables, FGB – MRM2 gap spanners, MLM-USOS ETHERNET cable • Installation of gap spanners SM – MRM2 (if time allows) • Retracted & stowed Strela-1 on DC1
449
371
Russia
Fyodor Yurchikhin Alexander Misurkin
ISS Incr-36
2013-08-22T00:00:00
5:58
• Retrieved laser downlink comm experiment from SM and replaced it with a biaxial camera pointing system. • Inspected all 6 ATV WAL PCE antennas and tightened loose screws that lost an antenna cover overboard. • collected surface “Test” samples on MRM2 EV Hatch 2 • Installed 2 gap spanners on SM Displ...
358
2
USA
David Scott
Gemini VIII
null
0:00
HHMU EVA cancelled before starting by stuck on vehicle thruster that ended mission early
0
77
USA
Leroy Chiao Dan Barry
STS-72
null
6:09
ISS umbilical tests with robotically transported portable work platform. Elec cuff checklist demo.
369
78
USA
Leroy Chiao Winston Scott
null
null
6:53
ISS thermal comfort test, cable tray test, APFR load test. Thermal cube experiment
413
79
USA
Linda Godwin Rich Clifford
STS-76
null
6:03
Deploy 4 MEEP materials experiments on Mir docking module. Test US/Russian tether and PFR. Retrieve camera from docking module exterior
363
80
USA
Mark Lee Steve Smith
STS-82 / HST-2
null
6:42
HST servicing (first STS external airlock sortie, depress gas flow disturbed HST solar arrays, remove/install GHRS/STIS, FOS/NICMOS )
402
81
USA
Greg Harbaugh Joe Tanner
STS-82 / HST-2
null
7:27
HST servicing (remove/install FGS-1/FGS-1R, replace ESTR-2, install OCE enhancement kit)
447
82
USA
Mark Lee Steve Smith
STS-82 / HST-2
null
7:11
HST servicing (remove/install DUI-2/DIU-2R, ESTR-1/SSR, replace RWA)
431
83
USA
Greg Harbaugh Joe Tanner
STS-82 / HST-2
null
6:34
HST servicing (replace SADE, install MSS cover, retrieve degraded MLI sample, install MLI patches)
394
84
USA
Mark Lee Steve Smith
STS-82 / HST-2
null
5:17
HST servicing (unscheduled EVA to add protective covers over degrading aluminized insulation)
317
85
USA
Scott Parazynski Vladimir Titov
STS-86
null
5:01
Retrieve 4 MEEP materials experiments on Mir docking module. Test US/Russian tethers and PFR. US safety tether would not retract. Deploy Spektr solar array base sealing cap on docking module.
301
177
USA
Rick Linnehan Garrett Reisman
STS-123/1JA
null
7:01
ISS based EVA. Enabled installation of Japanese logisics module by demating heater cables and removed berthing mechanism covers. Installed tool devices on Canadian SPDM robot arms. Marked sharp edge on airlock handrail with wiretie and found 2nd sharp edge on portable handle
421
178
USA
Rick Linnehan Mike Foreman
STS-123/1JA
null
7:08
ISS based EVA. Installed both arms on Canadian SPDM robot. Had to use prybar to release 2 expandable dia fasteners
428
179
USA
Rick Linnehan Robert Behnken
STS-123/1JA
null
6:53
ISS based EVA. Installed cameras, lights and tool and spares holders on SPDM. Removed all but a few blankets from SPDM. Readied SPDM's spacelab pallet for return via Shuttle. Transferred spares from Shuttle to ISS (robotic yaw joint, 2 DCSU). Installed experiment pallet on Columbus. Unable to install MISSE experiments ...
413
180
USA
Robert Behnken Mike Foreman
STS-123/1JA
null
6:24
ISS based EVA. Replaced failed RPCM to permit separate power to CMG2, but not able to demate elec connector of Z1 patch panel to enable power reconfig. Tested Shuttle tile repair materials, tools and techniques. Released launch locks of Node 2 nadir and port berth mech. Removed last thermal cover from SPDM hand. Did no...
384
208
USA
Bob Behnken Nick Patrick
STS-130/20A
null
6:32
ISS based EVA. Prepared Node 3 for ISS install by removing covers and heater cables. Prepositioned ammonia lines and thermal covers. Installed Node 3 avionics and heater cables. Removed/stowed the SPDM ORU Temporary Platform (OTP). Relocated NH3 jumper bag and released tape restraining Node 3 gap spanners. One suit fan...
392
209
USA
Bob Behnken Nick Patrick
STS-130/20A
null
5:53
ISS based EVA. Outfitted Node 3 by installing 2 NH3 lines, heater cables, trunnion/keel thermal covers, negative pressure vent, handrail gap spanners and 8 handrails. Opened loop A NH3 line and nadir berthing mechanism pedals and centerline camera thermal cover. Visually verified berthing seals OK. Small NH3 leak induc...
353
210
USA
Bob Behnken Nick Patrick
STS-130/20A
null
5:48
ISS based EVA. Connected PMA3 heater and data cables. Opened loop B NH3 line. Disconnected Node 3 temp heater cable. Removed Cupola thermal covers and released launch locks of window shutters Installed Node 3 handrails, foot restraint sockets and a handrail gap spanner. Routed FGB grapple fixture video cable. Closed No...
348
233
Russia
Alexei Leonov
Voskhod 2
null
0:12
World’s first EVA, Berkut umbilical suit, Volga inflatable airlock. Had to partially reduce suit pressure to turnaround in airlock and close hatch
12
234
Russia
Aleksei Yeliseyov Yevgeni Khrunov
Soyuz 4&5
null
0:37
New airlock, Yastreb self-contained life support suit, vehicle-vehicle EVA crew transfer. Lost camera
37
235
Russia
Victor Lazerov Oleg Makarov
Soyuz 12
null
0:00
New Orlan D suits checked out inside cabin
0
236
Russia
Yuri Romanenko Georgi Grechko
Soyuz 26 Salyut 6
null
1:28
Docking unit inspection. Tested new Orlan D suits. G. saves R. from untethered loss out of airlock. Both always attached via umbilicals??
88
240
Russia
Vladimir Lyakhov Alexandr Alexandrov
Soyuz T-9 Salyut 7
null
2:49
After in-cabin improvised repair of damaged suit leg bladder using aluminum ring and rubber, installed one solar array addition
169
241
Russia
Vladimir Lyakhov Alexandr Alexandrov
Soyuz T-9 Salyut 7
null
2:55
Install second solar array addition
175
249
Russia
Vladimir Dzhanibekov Victor Savinykh
Soyuz T-13 Salyut 7
null
4:58
Install solar array addition (2), install French ISTOK-EM micro-meteroid collectors, test new Orlan DM suit
298
255
Russia
Vladimir Titov Musa Manarov
Soyuz TM-4 Mir
null
4:10
Disassemble modified arrays, install test arrays
250
257
Russia
Vladimir Titov Musa Manarov
Soyuz TM-4 Mir
null
4:12
Complete replacement of telescope detector module, use new Orlan DMA’s
252
258
Russia
Alexandr Volkov Jean-Louc Chretien
Soyuz TM-7 Mir
null
5:57
French ERA truss experiment deploy and jettison. Deploy Enchantillon materials experiment
357
262
Russia
Alexandr Viktorenko Alexandr Serebrov
Soyuz TM-8 Mir
null
4:59
Checkout Kvant 2 airlock & new Orlan DMA. MMU flown tethered for 40 min to 33m.
299
263
Russia
Alexandr Viktorenko Alexandr Serebrov
Soyuz TM-8 Mir
null
3:45
Checkout Kvant 2 airlock & new Orlan DMA. MMU flown tethered for 93 min to 45m. SPIN-6000 rad sensor on MMU
225
277
Russia
Alexandr Volkov Sergei Krikalev
Soyuz TM-13 Mir
null
4:13
V. suit cooling sublimator failed so must stay on umbilical. Base block solar panel section collected. Material experiments deployed and retrieved on Kvant2 (Sprut, SKK, DankoM, Plenka)
253
279
Russia
Anatoli Solovyov Sergei Avdeyev
Soyuz TM-15 Mir
null
3:56
Prepare 700kg thruster box for Sofora truss. Install truss hinge lock
236
280
Russia
Anatoli Solovyov Sergei Avdeyev
Soyuz TM-15 Mir
null
5:08
Install thruster control cables on Sofora truss. Attach truss to thruster box mounted on Progress
308
288
Russia
Valeri Tsibliyev Alexandr Serebrov
Soyuz TM-17 Mir 16
null
0:37
Exterior inspections started. SKK science deployed. O2 failure in S's suit stops work
37
289
Russia
Valeri Tsibliyev Alexandr Serebrov
Soyuz TM-17 Mir 16
null
4:12
Complete Panorama exterior inspections, discard used Orlan suit
252
290
Russia
Yuri Malenchenko Talgat Musabeyev
Soyuz TM-18 Mir 17
null
5:05
Inspect Progress docking system, prepare base for 2nd cargo boom (with hole punch), material science deployed/retrieved (Platan 4/5, SKK)
305
300
Russia
Sergei Avdeyev Thomas Reiter
Soyuz TM-X Mir 20
null
5:16
Deploy ESEF materials experiment and replace Komza cassettes on Spektr
316
301
Russia
Sergei Avdeyev Yuri Gidzenko
Soyuz TM-X Mir 20
null
0:32
Move base block docking port as prep for Priroda docking
32
302
Russia
Yuri Gidzenko Thomas Reiter
Soyuz TM-X Mir 20
null
3:06
Retrieve ESEF sample cassettes from Spektr. Relocate MMU to stow site on Kvant-2 exterior
186
303
Russia
Yuri Onufrenko Yuri Usachev
Soyuz TM-23 Mir 21
null
5:51
Deploy second cargo crane. Prepare solar array install site on Kvant-1
351
309
Russia
Valery Korzun Alexander Kaleri
Soyuz TM-24 Mir 22
null
5:57
Install last 1/2 of cables for cooperative array on Kvant-1. Connect solar array power cables on base block. Relocate Rapana truss to Ferma-3 truss
357
310
Russia
Valery Korzun Alexander Kaleri
Soyuz TM-24 Mir 22
null
6:36
Install Kurs antenna on docking module (including routing/mating cable to Kristall). Tighten connector of amateur radio antenna on base block
396
349
Russia
Pavel Vinogradov Jeff Williams
ISS Incr-13
null
6:31
Installed new hydrogen vent for Elektron O2 generator. Retrieved Kromka, BKHD and Biorisk experiments. Relocated ATV WAL3 antenna cable to improve system performance. Photographed ATV WAL2 antenna and SM reboost engine to aid engine cover troubleshooting. Lost crane foot restraint adapter. Replaced MBS camera (EVA exte...
391
356
Russia
Yuri Lonchakov Mike Fincke
ISS Incr-18
null
5:39
Installed Langmuir probe to aid Soyuz reentry sep analysis. Retrieved a BIORISK can. Installed EXPOSE R and Impulse experiments. Had to deinstall and return EXPOSE R to cabin when it wouldn’t activate. Deferred other tasks. Failed valve forced use of stored gas to repress airlock.
339
null
USA
Tom Jones Tammy Jernigan
STS-80
null
0:00
Loose screw jammed in hatch latch actuator prevented airlock egress
0